My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YIN <br /> III NZ,I <br /> IN <br /> f kn'xa IN <br /> }*.. <br /> r Y „ +j . F" ,yr 5 <br /> v tl ;, , ; tx "+ t '� a x . . r yCrd <br /> ICIA,,� _.,,..' <br /> IN <br /> IN <br /> frequency of testing. Generate random numbers based on the two LOTS under consideration . IN <br /> When Quality Control test frequency is reduced to one every two LOTS , obtain the Engineer ' s <br /> approval to place more than one LOT over an untested LOT . Assure similar compaction efforts <br /> for the untested sections . If the Verification test fails , and Quality Control test data is not upheld <br /> IN <br /> by Resolution testing the Quality Control testing will revert to the original frequency. <br /> 160 STABILIZING. <br /> IN <br /> (REV 5-2040) (FA 74240) (141 ) <br /> SUBARTICLE 160- 3 . 2 (Pages 196 — 197 ) is deleted and the following substituted : <br /> 160-3 . 2 Application of Stabilizing Material : After substantially completing the roadbedIN I <br /> NI <br /> grading operations, determine the type and quantity (if any) of stabilizing material necessary forIII <br /> compliance with the bearing value requirements . Ensure the maximum final quantity of ReclaimedIN <br /> Asphalt Pavement (RAP) in the subgrade area is no more than 25 % by volume of the stabilized area . <br /> Notify the Engineer of the approximate quantity to be added before spreading . When additive <br /> stabilizing materials are required, spread the material uniformly over the area to be stabilized. <br /> 160-3 . 2 . 1 Sampling and Testing of Local Material : Randomly select locations <br /> for sampling using a random number generator approved by the Engineer and test at the <br /> IN <br /> minimum frequency listed in the table below before mixing. The Engineer will reject the <br /> material for failing QC test results . The Engineer will sample for Verification and Resolution <br /> testing at the minimum frequency listed in the table below . The Engineer will perform <br /> Verification tests at the minimum frequency listed in the table below . <br /> IN <br /> Test Name Quality Control Verification Resolution <br /> Liquid Limit (LL) , Plastic One per two LOTs <br /> IndexP and Organic One per eight <br /> (PI) , <br /> I) ' g LOTS One per eight LOTs <br /> Content <br /> IN <br /> 160-3 .2 . 1 . 1 Verification Comparison Criteria and Resolution <br /> Procedures : If the QC and the Department ' s Verification tests meet the requirements of <br /> Section 914 then the Engineer will accept the corresponding LOTS . Otherwise, the Engineer will <br /> submit the Resolution sample to the State Materials Office or an AASHTO accredited laboratory <br /> designated by the State Materials Office to perform Resolution testing . <br /> If the Resolution Test results meet the requirements of Section 914 then the <br /> Engineer will accept the LOTS in question . Otherwise remove the material and apply new <br /> material meeting the requirements of Section 914 and retest in accordance with 160 - 3 . 2 . <br /> SUBARTICLE 1604 . 3 . 2 (Page 200) is deleted and the following substituted : <br /> 1604 .3 . 2 Department Verification Tests : <br /> 1604 .3 . 2 . 1 Bearing Value & Soil Classification : The Engineer will <br /> collect a sample at a location other than the location where the sample was collected in 160 - <br /> - 58 - <br /> FPID ( S ) : 423186- 1 - 58 - 01 <br /> NN <br /> �s5 , r Yti � ds '+ , A -✓ x h . .: e 1" l r* xx+g F, . 3 k ""` . <br /> k , . u <br /> ss » <br /> ., <br />
The URL can be used to link to this page
Your browser does not support the video tag.