IN <br /> , .. ' S =" Hr �;.� n ':^ `F m, a k y. yr 'r d , v+# - +� ?ter <br /> 5 - ^" <br /> TABLE 327 - 1 <br /> Cross Slope Milling Acceptance Tolerance <br /> Individual <br /> Roadway Feature Absolute Average Absolute Deviation <br /> Deviation <br /> Tangent section 0 . 4% 0 . 2 % <br /> (including turn lanes) <br /> Superelevated curve 0 . 4% 0 . 2 % <br /> Shoulder 0 . 5 % 0 . 5 % <br /> In the event that the distance between tow edges of deficient areas is less than 100 <br /> feet, the correction work shall include the area between the deficient sections . <br /> 327-3 .3 Verification : The Engineer will verify the Contractor ' s cross slope <br /> measurements by randomly taking a minimum of ten cross slope measurements per lane per mile <br /> in tangent sections , control points in transition sections , and a minimum of three cross slope <br /> measurements on fully superelevated sections . The Engineer will measure the cross slope of the <br /> milled surface by placing the level at the center location of a lane and perpendicular to the <br /> roadway centerline . If the average absolute deviation or an individual cross slope deviation falls <br /> outside the acceptance tolerance as shown in Table 327 - 1 , immediately make a comparison <br /> check at the QC test locations to verify the QC measurements in the questionable section . If the <br /> comparisons are beyond the acceptable comparison tolerance in accordance with 327 -3 . 2 , stop <br /> the milling operation until the problem is resolved to the satisfaction of the Engineer. Correct any <br /> cross slope not meeting the individual deviation acceptance tolerance at no cost to the <br /> Department . The Engineer reserves the right to check the cross slope of the milled surface at any <br /> time by taking cross slope measurements at any location . <br /> 330 HOT BITUMINOUS MIXTURES — GENERAL CONSTRUCTION <br /> REQUIREMENTS . <br /> (REV 5-2440) (FA 84640) ( 141 ) 7 . 11 <br /> SECTION 330 (Pages 250-265 ) is deleted and the following substituted : <br /> SECTION 330 <br /> HOT BITUMINOUS MIXTURES - <br /> GENERAL CONSTRUCTION REQUIREMENTS <br /> 3304 Description . <br /> Construct plant-mixed hot bituminous pavements and bases . Establish and maintain a <br /> quality control system that provides assurance that all materials , products and completed <br /> construction submitted for acceptance meet Contract requirements . <br /> 330-2 Quality Control Requirements . <br /> 330-2 . 1 Minimum Quality Control Plan Requirements : In addition to the <br /> requirements set forth in Section 105 , perform as a minimum the following activities necessary <br /> to maintain process control and meet specification requirements : <br /> - 66 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> IN I INN <br /> IN <br /> CNN. NIT, <br /> ININNNIN <br /> IN N?N <br /> ... _.. , . . w* .c ,. „_ . . ,. .. � . n .. <br />