Laserfiche WebLink
Stockpiles : Assure materials are placed in the correct stockpile ; assure good <br /> stockpiling techniques ; inspect stockpiles for separation, contamination, segregation , etc . ; <br /> properly identify and label each stockpile . <br /> Incoming Aggregate : Obtain gradations and bulk specific gravity (GO values <br /> from aggregate supplier for reference ; determine the gradation of all component materials ; <br /> routinely compare gradations and Gsb values to mix design . <br /> Cold Bins : Calibrate the cold gate/feeder belt for each material ; determine cold <br /> gate/feeder belt settings ; observe operation of cold feeder for uniformity. <br /> Dryer: Observe pyrometer for aggregate temperature control ; observe efficiency <br /> of the burner. <br /> For Batch Plants , determine percent used and weight to be pulled from each bin to <br /> assure compliance with Mix Design, check mixing time , and check operations of weigh bucket <br /> and scales . <br /> For Drum Mixer Plants , determine aggregate moisture content, and calibrate the <br /> weigh bridge on the charging conveyor. <br /> Control Charts : Plot and keep charts updated daily for all Quality Control <br /> Sampling and Testing and post in the asphalt lab where they can be seen . Provide the following <br /> charts : <br /> 1 . All components used to determine the composite pay factor (No . 8 <br /> sieve , No . 200 sieve , asphalt binder content, air voids , and density) by lot. <br /> 2 . Gradation of incoming aggregate . <br /> 3 . Gradation, asphalt binder content, and maximum specific gravity (Gm, ,) <br /> of RAP . <br /> 4 . Any other test result or material characteristic (as determined by the <br /> Contractor) necessary for process control . <br /> The above listed minimum activities are to be considered normal activities <br /> necessary to control the production of hot mix asphalt at an acceptable quality level . It is <br /> recognized, however, that depending on the type of process or materials , some of the activities <br /> listed may not be necessary and in other cases , additional activities may be required . The <br /> frequency of these activities will also vary with the process and the materials . When the process <br /> varies from the defined process average and variability targets , the frequency of these activities <br /> will be increased until the proper conditions have been restored . <br /> 330-2 .2 Minimum Process Control Testing Requirements : Perform, as a minimum, <br /> the following activities at the testing frequencies provided below : <br /> Asphalt Plant <br /> 1 . Asphalt Mix : Determine the asphalt binder content ; mix gradation and <br /> volumetric properties at a minimum frequency of one per day. In the event that the daily <br /> production exceeds 1 , 000 tons , perform these tests a minimum of two times per day. Quality <br /> Control tests used in the acceptance decision may be used to fulfill this requirement . Verify <br /> modifier addition . <br /> 2 . Aggregate : Test one sample for gradation per 1 , 000 tons of incoming <br /> aggregate , as it is stockpiled. <br /> 3 . Aggregate moisture content from stockpiles or combined cold feed <br /> aggregate - one per day. <br /> 4 . RAP : Test one sample per 1000 tons of incoming material (prior to <br /> incorporation into the mix) for gradation and asphalt binder content . Test one sample per 5 , 000 <br /> - 67 - <br /> FPID ( S ) : 423186 - 1 - 58 -01 <br />