My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stockpiles : Assure materials are placed in the correct stockpile ; assure good <br /> stockpiling techniques ; inspect stockpiles for separation, contamination, segregation , etc . ; <br /> properly identify and label each stockpile . <br /> Incoming Aggregate : Obtain gradations and bulk specific gravity (GO values <br /> from aggregate supplier for reference ; determine the gradation of all component materials ; <br /> routinely compare gradations and Gsb values to mix design . <br /> Cold Bins : Calibrate the cold gate/feeder belt for each material ; determine cold <br /> gate/feeder belt settings ; observe operation of cold feeder for uniformity. <br /> Dryer: Observe pyrometer for aggregate temperature control ; observe efficiency <br /> of the burner. <br /> For Batch Plants , determine percent used and weight to be pulled from each bin to <br /> assure compliance with Mix Design, check mixing time , and check operations of weigh bucket <br /> and scales . <br /> For Drum Mixer Plants , determine aggregate moisture content, and calibrate the <br /> weigh bridge on the charging conveyor. <br /> Control Charts : Plot and keep charts updated daily for all Quality Control <br /> Sampling and Testing and post in the asphalt lab where they can be seen . Provide the following <br /> charts : <br /> 1 . All components used to determine the composite pay factor (No . 8 <br /> sieve , No . 200 sieve , asphalt binder content, air voids , and density) by lot. <br /> 2 . Gradation of incoming aggregate . <br /> 3 . Gradation, asphalt binder content, and maximum specific gravity (Gm, ,) <br /> of RAP . <br /> 4 . Any other test result or material characteristic (as determined by the <br /> Contractor) necessary for process control . <br /> The above listed minimum activities are to be considered normal activities <br /> necessary to control the production of hot mix asphalt at an acceptable quality level . It is <br /> recognized, however, that depending on the type of process or materials , some of the activities <br /> listed may not be necessary and in other cases , additional activities may be required . The <br /> frequency of these activities will also vary with the process and the materials . When the process <br /> varies from the defined process average and variability targets , the frequency of these activities <br /> will be increased until the proper conditions have been restored . <br /> 330-2 .2 Minimum Process Control Testing Requirements : Perform, as a minimum, <br /> the following activities at the testing frequencies provided below : <br /> Asphalt Plant <br /> 1 . Asphalt Mix : Determine the asphalt binder content ; mix gradation and <br /> volumetric properties at a minimum frequency of one per day. In the event that the daily <br /> production exceeds 1 , 000 tons , perform these tests a minimum of two times per day. Quality <br /> Control tests used in the acceptance decision may be used to fulfill this requirement . Verify <br /> modifier addition . <br /> 2 . Aggregate : Test one sample for gradation per 1 , 000 tons of incoming <br /> aggregate , as it is stockpiled. <br /> 3 . Aggregate moisture content from stockpiles or combined cold feed <br /> aggregate - one per day. <br /> 4 . RAP : Test one sample per 1000 tons of incoming material (prior to <br /> incorporation into the mix) for gradation and asphalt binder content . Test one sample per 5 , 000 <br /> - 67 - <br /> FPID ( S ) : 423186 - 1 - 58 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.