Laserfiche WebLink
7 TO <br /> I IT <br /> In <br /> TO 0 <br /> ,� { d <br /> I On <br /> z Y 1 _ - - <br /> TO 11 TO TO TOT I, . ;TO Im T On I'llzs`�"'ti=? ' TO <br /> r "�.;r ik^ ;* a . , ' II ell I IT 11 <br /> + -' y. d „ar ,. :i `a a . a rgr zis „ , �. ,, ,;I I TO On Nrz " ffin , .TO ,nf <br /> , se,..... s.-m' ;''^,'s,, €"iiaOf „`-- ` "� = ,,, ;"' � 1T' "trOn T7 TO IT T 11 <br /> T IT <br /> ITT <br /> tons of incoming material (prior to incorporation into the mix) for maximum specific gravity <br /> (Gmm) and recovered viscosity. <br /> 5 . Mix temperature at the plant for the first five loads and one out of every <br /> five loads thereafter. <br /> 6 . Other tests (as determined necessary by the Contractor) for process <br /> control . <br /> Roadway <br /> 1 . Monitor the pavement temperature with an infrared temperature device . <br /> Monitor the roadway density with either 6 inches diameter roadway cores , a nuclear density <br /> TO gauge, or other density measuring device , at a minimum frequency of once per 1 , 500 feet of <br /> pavement. When the layer thickness is greater than or equal to 1 inch (or the spread rate is <br /> greater than or equal to 105 lb per ydZ) and an approved rolling pattern is used in lieu of density <br /> testing, identify in the QC Plan how the pavement density will be monitored. <br /> 2 . Mix temperature at the roadway for the first five loads and one out of <br /> every five loads thereafter. <br /> 3 . Monitor the pavement smoothness with a 150TT- foot rolling straightedge , <br /> as required by these specifications . <br /> TO 4 . Monitor the pavement cross slope at a frequency necessary to fulfill the <br /> requirements of these specifications , and identify a system to control the cross slope of each <br /> pavement layer during construction . <br /> 5 . Monitor the mix spread rate at the beginning of each day ' s production, <br /> and as needed to control the operations , at a minimum of once per 200 tons placed to ensure that <br /> the spread rate is within 5 % of the target spread rate . When determining the spread rate , use , at a <br /> minimum , an average of five truckloads of mix . When the average spread rate is beyond plus or <br /> minus 5 % of the target spread rate, monitor the thickness of the pavement layer closely and <br /> adjust the construction operations . <br /> If the Contractor fails to maintain an average spread rate within plus or <br /> minus 5 % of the target spread rate for two consecutive days , the Engineer may elect to stop the <br /> construction operation at any time until the problem is resolved. <br /> 330-2 .3 Minimum Quality Control System Requirements . <br /> 330-2 .3 . 1 Personnel Qualifications : Provide Quality Control Technicians in <br /> accordance with Section 105 . <br /> 330-2 .3 .2 Hot Mix Asphalt Testing Laboratory Requirements : Furnish or have <br /> furnished a fully equipped asphalt laboratory (permanent or portable) at the production site . The <br /> Laboratory must be qualified under the Department ' s Laboratory Qualification Program, as <br /> described in Section 105 -6 . In addition , the laboratory shall meet the following requirements . <br /> 1 . Area - The effective working area of the laboratory shall be a minimum <br /> of 180 ft' , with a layout of which will facilitate multiple tests being run simultaneously by two <br /> technicians . This area does not include the space for desks , chairs and file cabinets . Any <br /> variations shall be approved by the Engineer. <br /> 2 . Lighting - The lighting in the lab must be adequate to illuminate all <br /> areas of the work. <br /> 3 . Temperature Control - Equip the lab with heating and air conditioning <br /> units that provide a satisfactory working environment . <br /> 4 . Ventilation - Equip the lab with fume hoods and exhaust fans that will <br /> remove all hazardous fumes from within the laboratory in accordance with OSHA requirements . <br /> - 68 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> IT <br /> IT, nnn On <br /> T TO � � IN <br /> T11 . . , .u.�. v. , _ ., , <br />