My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 TO <br /> I IT <br /> In <br /> TO 0 <br /> ,� { d <br /> I On <br /> z Y 1 _ - - <br /> TO 11 TO TO TOT I, . ;TO Im T On I'llzs`�"'ti=? ' TO <br /> r "�.;r ik^ ;* a . , ' II ell I IT 11 <br /> + -' y. d „ar ,. :i `a a . a rgr zis „ , �. ,, ,;I I TO On Nrz " ffin , .TO ,nf <br /> , se,..... s.-m' ;''^,'s,, €"iiaOf „`-- ` "� = ,,, ;"' � 1T' "trOn T7 TO IT T 11 <br /> T IT <br /> ITT <br /> tons of incoming material (prior to incorporation into the mix) for maximum specific gravity <br /> (Gmm) and recovered viscosity. <br /> 5 . Mix temperature at the plant for the first five loads and one out of every <br /> five loads thereafter. <br /> 6 . Other tests (as determined necessary by the Contractor) for process <br /> control . <br /> Roadway <br /> 1 . Monitor the pavement temperature with an infrared temperature device . <br /> Monitor the roadway density with either 6 inches diameter roadway cores , a nuclear density <br /> TO gauge, or other density measuring device , at a minimum frequency of once per 1 , 500 feet of <br /> pavement. When the layer thickness is greater than or equal to 1 inch (or the spread rate is <br /> greater than or equal to 105 lb per ydZ) and an approved rolling pattern is used in lieu of density <br /> testing, identify in the QC Plan how the pavement density will be monitored. <br /> 2 . Mix temperature at the roadway for the first five loads and one out of <br /> every five loads thereafter. <br /> 3 . Monitor the pavement smoothness with a 150TT- foot rolling straightedge , <br /> as required by these specifications . <br /> TO 4 . Monitor the pavement cross slope at a frequency necessary to fulfill the <br /> requirements of these specifications , and identify a system to control the cross slope of each <br /> pavement layer during construction . <br /> 5 . Monitor the mix spread rate at the beginning of each day ' s production, <br /> and as needed to control the operations , at a minimum of once per 200 tons placed to ensure that <br /> the spread rate is within 5 % of the target spread rate . When determining the spread rate , use , at a <br /> minimum , an average of five truckloads of mix . When the average spread rate is beyond plus or <br /> minus 5 % of the target spread rate, monitor the thickness of the pavement layer closely and <br /> adjust the construction operations . <br /> If the Contractor fails to maintain an average spread rate within plus or <br /> minus 5 % of the target spread rate for two consecutive days , the Engineer may elect to stop the <br /> construction operation at any time until the problem is resolved. <br /> 330-2 .3 Minimum Quality Control System Requirements . <br /> 330-2 .3 . 1 Personnel Qualifications : Provide Quality Control Technicians in <br /> accordance with Section 105 . <br /> 330-2 .3 .2 Hot Mix Asphalt Testing Laboratory Requirements : Furnish or have <br /> furnished a fully equipped asphalt laboratory (permanent or portable) at the production site . The <br /> Laboratory must be qualified under the Department ' s Laboratory Qualification Program, as <br /> described in Section 105 -6 . In addition , the laboratory shall meet the following requirements . <br /> 1 . Area - The effective working area of the laboratory shall be a minimum <br /> of 180 ft' , with a layout of which will facilitate multiple tests being run simultaneously by two <br /> technicians . This area does not include the space for desks , chairs and file cabinets . Any <br /> variations shall be approved by the Engineer. <br /> 2 . Lighting - The lighting in the lab must be adequate to illuminate all <br /> areas of the work. <br /> 3 . Temperature Control - Equip the lab with heating and air conditioning <br /> units that provide a satisfactory working environment . <br /> 4 . Ventilation - Equip the lab with fume hoods and exhaust fans that will <br /> remove all hazardous fumes from within the laboratory in accordance with OSHA requirements . <br /> - 68 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> IT <br /> IT, nnn On <br /> T TO � � IN <br /> T11 . . , .u.�. v. , _ ., , <br />
The URL can be used to link to this page
Your browser does not support the video tag.