My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 . Equipment and Supplies - Furnish the lab with the necessary sampling <br /> and testing equipment and supplies for performing contractor Quality Control and Department <br /> Verification Sampling and Testing. A detailed list of equipment and supplies required for each <br /> test is included in the appropriate FDOT, AASHTO , or ASTM Test Method. <br /> 6 . Calibration of the Superpave Gyratory Compactor: Calibrate the <br /> Superpave Gyratory Compactor in accordance with the manufacturer ' s recommendations . <br /> Identify in the Quality Control Plan the established frequencies and document all calibrations . <br /> 7 . Personal Computer - Provide a personal computer capable of running a <br /> Microsoft Exceff spreadsheet program, along with a printer. <br /> 8 . Communication - Provide a telephone and fax machine (with a private <br /> line) for the use of the testing facility ' s quality control personnel . In addition, provide an Internet <br /> connection capable of uploading data to the Department ' s database and for e -mail <br /> communications . <br /> 330-3 Limitations of Operations . <br /> 330-3 . 1 Weather Limitations : Do not transport asphalt mix from the plant to the <br /> roadway unless all weather conditions are suitable for the laying operations . <br /> 330-3 .2 Limitations of Laying Operations : <br /> 330-3 .2 . 1 General : Spread the mixture only when the surface upon which it is to <br /> be laid has been previously prepared, is intact, firm, dry, clean , and the tack or prime coat, with <br /> acceptable spread rate , is properly broken or cured. Do not place friction course until the <br /> adjacent shoulder area has been dressed and grassed . <br /> 330-3 .2 . 2 Temperature : Spread the mixture only when the air temperature in the <br /> shade and away from artificial heat is at least 40°F for layers greater than 1 inch ( 100 lb/yd') in <br /> thickness and at least 45°F for layers 1 inch ( 100 lb/yd ) or less in thickness (this includes <br /> leveling courses) . The minimum temperature requirement for leveling courses with a spread rate <br /> of 50 lb/yd2 or less is 50°F . The minimum ambient temperature requirement may be reduced by 5 °F <br /> when using warm mix technology, if mutually agreed to by both the Engineer and the Contractor. <br /> 330-3 .2 .3 Wind : Do not spread the mixture when the wind is blowing to such an <br /> extent that proper and adequate compaction cannot be maintained or when sand, dust, etc . , are <br /> being deposited on the surface being paved to the extent that the bond between layers will be <br /> diminished. <br /> 330-3 . 2 .4 Night Paving : Meet the requirements of 8 -4 . 1 . <br /> 3304 Preparation of Asphalt Binder. <br /> Deliver the asphalt binder to the asphalt plant at a temperature not to exceed 370°F , and <br /> equip the transport tanks with sampling and temperature sensing devices meeting the <br /> requirements of 300 -3 . 2 . Maintain the asphalt binder in storage within a range of 230 to 370°F in <br /> advance of mixing operations . Maintain constant heating within these limits, and do not allow <br /> wide fluctuations of temperature during a day ' s production . <br /> 330-5 Preparation of Aggregates . <br /> 330-5 . 1 Stockpiles : Place each aggregate component in an individual stockpile , and <br /> separate each from the adjacent stockpiles , either by space or by a system of bulkheads . Prevent <br /> the intermingling of different materials in stockpiles at all times . Identify each stockpile , <br /> including RAP , as shown on the mix design . <br /> - 69 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> �t ,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.