5 . Equipment and Supplies - Furnish the lab with the necessary sampling <br /> and testing equipment and supplies for performing contractor Quality Control and Department <br /> Verification Sampling and Testing. A detailed list of equipment and supplies required for each <br /> test is included in the appropriate FDOT, AASHTO , or ASTM Test Method. <br /> 6 . Calibration of the Superpave Gyratory Compactor: Calibrate the <br /> Superpave Gyratory Compactor in accordance with the manufacturer ' s recommendations . <br /> Identify in the Quality Control Plan the established frequencies and document all calibrations . <br /> 7 . Personal Computer - Provide a personal computer capable of running a <br /> Microsoft Exceff spreadsheet program, along with a printer. <br /> 8 . Communication - Provide a telephone and fax machine (with a private <br /> line) for the use of the testing facility ' s quality control personnel . In addition, provide an Internet <br /> connection capable of uploading data to the Department ' s database and for e -mail <br /> communications . <br /> 330-3 Limitations of Operations . <br /> 330-3 . 1 Weather Limitations : Do not transport asphalt mix from the plant to the <br /> roadway unless all weather conditions are suitable for the laying operations . <br /> 330-3 .2 Limitations of Laying Operations : <br /> 330-3 .2 . 1 General : Spread the mixture only when the surface upon which it is to <br /> be laid has been previously prepared, is intact, firm, dry, clean , and the tack or prime coat, with <br /> acceptable spread rate , is properly broken or cured. Do not place friction course until the <br /> adjacent shoulder area has been dressed and grassed . <br /> 330-3 .2 . 2 Temperature : Spread the mixture only when the air temperature in the <br /> shade and away from artificial heat is at least 40°F for layers greater than 1 inch ( 100 lb/yd') in <br /> thickness and at least 45°F for layers 1 inch ( 100 lb/yd ) or less in thickness (this includes <br /> leveling courses) . The minimum temperature requirement for leveling courses with a spread rate <br /> of 50 lb/yd2 or less is 50°F . The minimum ambient temperature requirement may be reduced by 5 °F <br /> when using warm mix technology, if mutually agreed to by both the Engineer and the Contractor. <br /> 330-3 .2 .3 Wind : Do not spread the mixture when the wind is blowing to such an <br /> extent that proper and adequate compaction cannot be maintained or when sand, dust, etc . , are <br /> being deposited on the surface being paved to the extent that the bond between layers will be <br /> diminished. <br /> 330-3 . 2 .4 Night Paving : Meet the requirements of 8 -4 . 1 . <br /> 3304 Preparation of Asphalt Binder. <br /> Deliver the asphalt binder to the asphalt plant at a temperature not to exceed 370°F , and <br /> equip the transport tanks with sampling and temperature sensing devices meeting the <br /> requirements of 300 -3 . 2 . Maintain the asphalt binder in storage within a range of 230 to 370°F in <br /> advance of mixing operations . Maintain constant heating within these limits, and do not allow <br /> wide fluctuations of temperature during a day ' s production . <br /> 330-5 Preparation of Aggregates . <br /> 330-5 . 1 Stockpiles : Place each aggregate component in an individual stockpile , and <br /> separate each from the adjacent stockpiles , either by space or by a system of bulkheads . Prevent <br /> the intermingling of different materials in stockpiles at all times . Identify each stockpile , <br /> including RAP , as shown on the mix design . <br /> - 69 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> �t ,. <br />