My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IN I <br /> I <br /> 73 IN I , moi- r` - ' _ , , �, :. <br /> � .: ,. . <br /> 12 <br /> IN <br /> IN <br /> 3304 Transportation of the Mixture. <br /> Transport the mixture in tight vehicles previously cleaned of all foreign material . After <br /> cleaning, thinly coat the inside surface of the truck bodies with soapy water or an asphalt release <br /> agent as needed to prevent the mixture from adhering to the beds . Do not allow excess liquid to <br /> pond in the truck body. Do not use diesel fuel or any other hazardous or environmentally <br /> detrimental material as a coating for the inside surface of the truck body. Cover each load during <br /> IN cool and cloudy weather and at any time it appears rain is likely during transit with a tarpaulin or <br /> waterproof cover meeting requirements of 320 - 5 . 4 . <br /> 3304 Preparation of Application Surfaces . <br /> 330-8 . 1 Cleaning : Prior to the laying of the mixture, clean the surface of the base or <br /> pavement to be covered of all loose and deleterious material by the use of power brooms or <br /> blowers , supplemented by hand brooming where necessary. <br /> 3304 . 2 Patching, Leveling, and Overbuild Courses : Where an asphalt mix is to be <br /> placed on an existing pavement or old base which is irregular, and wherever the plans indicate , <br /> bring the existing surface to proper grade and cross -section by the application of patching, <br /> leveling, or overbuild courses . <br /> 330-8.3 Application Over Surface Treatment : Where an asphalt mix is to be placed <br /> FF <br /> over a newly constructed surface treatment, sweep and dispose of all loose material from the <br /> paving area. <br /> 3304 .4 Coating Surfaces of Contacting Structures : Paint all structures which will be <br /> in actual contact with the asphalt mixture, with the exception of the vertical faces of existing <br /> pavement, curbs and gutter, with a uniform coating of asphalt binder to provide a closely bonded, <br /> watertight joint . <br /> 3304 . 5 Tack Coat : <br /> 3304 .5 . 1 Tack Coat Required : Apply a tack coat, as specified in Section 300 , <br /> on existing pavement structures that are to be overlaid with an asphalt mix and between <br /> successive layers of all asphalt mixes . <br /> 330-8 . 5 .2 Tack Coat at Engineer' s Option : Apply a tack coat on the following <br /> surfaces only when so directed by the Engineer : <br /> 1 . Freshly primed bases . <br /> 2 . Surface treatment. <br /> 330-9 Placing Mixture. <br /> 330-9 . 1 Requirements Applicable to All Types : <br /> 330-9. 1 . 1 Alignment of Edges . Lay all asphalt concrete mixtures , including <br /> leveling courses , other than the pavement edge just adjacent to curb and gutter or other true <br /> edges , by the stringline method to obtain an accurate , uniform alignment of the pavement edge . <br /> Control the unsupported pavement edge to ensure that it will not deviate more than ± 1 . 5 inches <br /> from the stringline . <br /> 330-9 . 1 .2 Temperature of Spreading : Maintain the temperature of the mix at the <br /> time of spreading within the master range as defined in 330 - 6 . 3 . The minimum frequency for <br /> taking mix temperatures on the roadway will be as indicated in 330 -6 . 3 . Any load or portion of a <br /> load of asphalt mix on the roadway with a temperature outside of the master range shall be <br /> rejected for use on the project. The Engineer will be immediately notified of the rejection . <br /> 330-9 . 1 .3 Rain and Surface Conditions : Immediately cease transportation of <br /> asphalt mixtures from the plant when rain begins at the roadway. Do not place asphalt mixtures <br /> - 72 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.