Laserfiche WebLink
CC`� <br /> R <br /> E ` <br /> I <br /> while rain is falling, or when there is water on the surface to be covered . Once the rain has <br /> rL <br /> stopped and water has been removed from the tacked surface to the satisfaction of the Engineer <br /> and the temperature of the mixture caught in transit still meets the requirements as specified in <br /> 330-9 . 1 . 2 , the Contractor may then place the mixture caught in transit. <br /> 330-9 . 1 .4 Speed of Paver : Establish the forward speed of the asphalt paver based <br /> on the rate of delivery of the mix to the roadway but not faster than the optimum speed needed to <br /> adequately compact the pavement . <br /> 330-9 . 1 . 5 Number of Crews Required : For each paving machine operated, use a <br /> separate crew, each crew operating as a full unit . The Contractor ' s CTQP Paving Level H <br /> technician in charge of the paving operations may be responsible for more than one crew but <br /> must be physically accessible to the Engineer at all times when placing mix . <br /> 330-9 . 1 . 6 Checking Depth of Layer : Check the depth of each layer at frequent <br /> intervals , and make adjustments when the thickness exceeds the allowable tolerance . When <br /> making an adjustment, allow the paving machine to travel a minimum distance of 32 feet to <br /> stabilize before the second check is made to determine the effects of the adjustment. <br /> 330-9 . 1 .7 Hand Spreading : In limited areas where the use of the spreader is <br /> impossible or impracticable , the Contractor may spread and finish the mixture by hand. <br /> 330-9 . 1 . 8 Straightedging and Back-patching : Straightedge and back-patch after <br /> obtaining initial compaction and while the material is still hot. <br /> 330-9 . 2 Requirements Applicable to Courses Other Than Leveling . <br /> 330-9 .2 . 1 Spreading and Finishing : Upon arrival , dump the mixture in the <br /> approved mechanical spreader, and immediately spread and strike -off the mixture to the full <br /> width required, and to such loose depth for each course that, when the work is completed, the <br /> required weight of mixture per square yard, or the specified thickness , is secured. Carry a <br /> uniform amount of mixture ahead of the screed at all times . <br /> 330-9.2 .2 Thickness and Spread Rate of Layers : Construct each course of Type SP <br /> mixtures in layers of the thickness shown in Section 334 . <br /> When the deficiency of the average spread rate for the total course <br /> pavement thickness measured in accordance with 330-2 . 2 exceeds the following maximum <br /> spread rate tolerance, address the deficient area in accordance with 330 - 12 . 5 . <br /> 1 . Structural Course (non- friction) <br /> a. For pavement of a design thickness of 2 - 1 /2 inches or <br /> more : plus or minus 50 lbs per sy. <br /> b . For pavement of a design thickness of less than 2 - <br /> 1 /2 inches : plus or minus 25 lbs per sy. <br /> 2 . Friction course <br /> a. For open grade friction course : plus or minus 15 lbs per <br /> sy. <br /> b . For dense grade friction course : plus or minus 25 lbs per <br /> Sys <br /> As an exception, the Engineer may allow the Contractor to leave <br /> areas in place if it is determined by the Engineer that the deficiency is not a significant detriment <br /> to the pavement quality . A reduction to the pay item quantity will be made in accordance with <br /> 330 - 12 . 5 . 2 . <br /> 330-9 .2 .3 Laying Width : If necessary due to the traffic requirements , lay the <br /> mixture in strips in such a manner as to provide for the passage of traffic . As an option, where <br /> the road is closed to traffic , lay the mixture to the full width with machines traveling in echelon . <br /> - 73 - <br /> FPID ( S ) : 423186 - 1 - 5 8 - 01 <br />