My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> If the average absolute deviation of the cross slope measurements falls <br /> outside the acceptance tolerance, as shown in Table 330 - 2 , stop the paving operations and make <br /> adjustments until the problems resolved to the satisfaction of the Engineer. If an individual <br /> eptance tolerance as shown in Table 330 -2 , make <br /> cross slope deviation falls outside the acc <br /> corrections in accordance with 330 - 12 . 5 only to cover the deficient area for the structural course <br /> at no cost to the Department. For pavement with multiple layers , the deficient areas for the <br /> structural course may be left in place, upon the approval of the Engineer . Complete corrections <br /> before placement of the final design surface layer (Type SP layer or friction course layer) , unless <br /> stated otherwise in the plans , or as determined by the Engineer. For friction course layers , make c <br /> corrections in accordance with 330 - 12 . 5 . <br /> The limits of deficient areas requiring correction may be verified and adjusted <br /> with more accurate measurement methods, including survey instruments , upon approval by the <br /> Engineer at no cost to the Department. <br /> Should the Contractor wish to have any corrections waived, submit a request <br /> to the Engineer for approval . The Engineer may waive the corrections at no reduction in payment if <br /> the deficiencies are sufficiently separated so as not to affect the overall traffic safety, surface <br /> drainage and ride quality characteristics of the pavement and the corrective action would <br /> unnecessarily mar the appearance of the finished pavement. <br /> For intersections, tapers , crossovers , transitions at the beginning and end of <br /> the project, bridge approaches and similar areas , adjust the cross slope to match the actual site <br /> conditions , or as directed by the Engineer. <br /> Table 330-2 <br /> Cross Slope Acceptance Tolerance <br /> Individual Average Absolute Deviation <br /> Roadway Feature Absolute Deviation g <br /> Tangent section 0 4% 0 . 2 % <br /> (including turn lanes) <br /> Su erelevated curve 0 . 4% 0 . 2% <br /> Shoulder 0 . 5 % 0 . 5 % <br /> In the event that the distance between two edges of deficient areas is less <br /> than 100 feet, the correction work shall include the area between the deficient sections . <br /> 330- 12 .3 .2 Verification : The Engineer will verify the Contractor ' s cross slope <br /> measurements by randomly taking a minimum of ten cross slope measurements per lane per mile <br /> in tangent sections , control points in transition sections , and a minimum of three cross slope <br /> measurements on fully superelevated sections over a day ' s production . The Engineer will <br /> measure the cross slope of the compacted pavement surface by placing the level at the center <br /> location of a lane and perpendicular to the roadway centerline . If the average absolute deviation <br /> or an individual cross slope deviation falls outside of the acceptance tolerance as shown in Table <br /> 330-2 , immediately make a comparison check at the QC test locations to verify the QC <br /> measurements in the questionable section . If the comparisons are beyond the acceptable <br /> comparison tolerance in accordance with 330 - 12 . 3 . 1 , stop the paving operations until the <br /> problem is resolved to the satisfaction of the Engineer. Correct any cross slope not meeting the <br /> individual deviation acceptance tolerance in accordance with 330 - 12 . 5 at no cost to the <br /> Department. The Engineer reserves the right to check the pavement cross slope at any time by <br /> taking cross slope measurements at any location . <br /> - 77 - <br /> FPID ( S ) : 423186 - 1 - 58 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.