My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
330- 13 Protection of Finished Surface. <br /> Keep sections of newly compacted asphalt concrete , which are to be covered by <br /> additional courses , clean until the successive course is laid . <br /> Do not dump embankment or base material directly on the pavement. Dress shoulders <br /> before placing the friction course on adjacent pavement. <br /> Equip blade graders operating adjacent to the pavement during shoulder construction <br /> with a 2 inch by 8 inch or larger board, or other attachment providing essentially the same <br /> results , attached to their blades in such manner that it extends below the blade edge in order to <br /> protect the pavement surface from damage by the grader blade . <br /> To prevent rutting or other distortion, protect sections of newly finished dense - graded <br /> friction course and the last structural layer prior to the friction course from traffic until the <br /> surface temperature has cooled below 160°F . <br /> The Contractor may use artificial methods to cool the pavement to expedite paving <br /> operations . The Department may direct the Contractor to use artificial cooling methods when <br /> maintenance of traffic requires opening the pavement to traffic at the earliest possible time . <br /> 334 SUPERPAVE ASPHALT CONCRETE . <br /> (REV 14041 ) (FA 1 -2741 ) (741 ) <br /> SECTION 334 (Pages 265 -291 ) is deleted and the following substituted : <br /> SECTION 334 <br /> SUPERPAVE ASPHALT CONCRETE <br /> 3344 Description . <br /> 334- 1 . 1 General : Construct a Superpave Asphalt Concrete pavement with the type of <br /> mixture specified in the Contract, or when offered as alternates , as selected. Superpave mixes are <br /> identified as Type SP- 9 . 5 , Type SP- 12 . 5 or Type SP- 19 . 0 . <br /> Meet the requirements of Section 320 for plant and equipment. Meet the general <br /> construction requirements of Section 330 , except as modified herein, including the provision for <br /> Quality Control Plans and Quality Control Systems as specified in Section 105 . <br /> 334- 1 .2 Traffic Levels : The requirements for Type SP Asphalt Concrete mixtures are <br /> based on the design traffic level of the project, expressed in 18 , 000 pound Equivalent Single <br /> Axle Loads (ESAL ' s) . The five traffic levels are as shown in Table 334 - 1 . <br /> Table 334- 1 <br /> Su erpave Traffic Levels <br /> Traffic Level Traffic Level ( 1x10 ESAL ' s) <br /> A <0 . 3 <br /> B 0 . 3 to <3 <br /> C 3 to < 10 <br /> D 10 to <30 <br /> E >30 <br /> - 81 - <br /> FPID (S ) : 423186 - 1 - 58 - 01 <br /> l <br /> s � <br />
The URL can be used to link to this page
Your browser does not support the video tag.