Laserfiche WebLink
V VV <br /> V IF <br /> straightedge testing a minimum of 48 hours before beginning testing . The Engineer will verify <br /> the straightedge testing by observing the Quality Control straightedging operations . Address all <br /> deficiencies in excess of 3 / 16 inch in accordance with 330 - 12 . 5 . <br /> Test and accept areas at the beginning and ending of the project, <br /> bridge approaches and departures , and areas where the segment is less than 0 . 01 mile, with the <br /> straightedge in accordance with 330- 12 . 4 . 5 . 5 and 330- 12 . 4 . 6 . 1 . <br /> 33042 .5 Unacceptable Pavement : <br /> 33042 .5 . 1 Corrections : Address all areas of unacceptable pavement at no cost to <br /> the Department . Retest all corrected areas and assure the requirements of these specifications are <br /> met. <br /> 33042 . 5. 1 . 1 Structural Layers : Correct all deficiencies , as defined in <br /> these Specifications , in the Type SP structural layers by one of the methods described below : <br /> a . Remove and replace the full depth of the layer, extending a <br /> minimum of 50 feet on both sides (where possible) of the defective area for the full width of the <br /> paving lane . <br /> b . Mill the pavement surface to a depth and width that is adequate <br /> to remove the deficiency. (This option only applies if the structural layer is not the final surface <br /> layer. ) <br /> 33042 .5 . 1 .2 Friction Course : Correct deficiencies in the friction course <br /> or final surface layer by removing and replacing the full depth of the layer, extending a minimum <br /> of 50 feet on both sides (where possible) of the defective area for the full width of the paving <br /> lane . As an exception, the Engineer may allow the contractor to leave these areas in place at if it <br /> is determined by the Engineer that the deficiency is not a significant detriment to the pavement <br /> quality. A reduction to the pay item quantity will be made in accordance with 330A2 . 5 . 2 . <br /> 33042 . 5 .2 Reduction in Pay Item Quantity : When the Engineer elects to waive <br /> corrections , the Department will reduce the pay quantity for the pay item in question by the <br /> amount of material that the Contractor would have removed and replaced had the correction been <br /> made . When the pay quantity is in tons , the Department will base the reduction on the volume of <br /> material that the Contractor would have removed (the length by the lane width by layer <br /> thickness) multiplied by the maximum specific gravity of the mix as determined through the <br /> following equation : <br /> Quantity (tons) = L x W x t x Gmm x 0 . 0024 <br /> Where : L = Lane length (ft . ) <br /> W = Lane width (ft. ) <br /> It = Layer thickness (in . ) <br /> Grnm = Maximum specific gravity from verified mix design <br /> For FC - 5 open- graded friction course, the Department will base the reduction on <br /> the area that the Contractor would have removed (the length by lane width) multiplied by a <br /> spread rate of 80 lb/yd2 as determined through the following equation : <br /> Quantity (tons) = L x W x 0 . 0044 <br /> Where : L = Lane length (ft. ) <br /> W = Lane width (ft . ) <br /> - 80 - <br /> FPID (S ) : 423186 - 1 - 5 8 - 01 <br />