Laserfiche WebLink
k� <br /> When the final structural course is to be opened to traffic and the <br /> design speed is 55 mph or greater, if any defect is 3 /8 inch or greater, the Engineer may require <br /> deficiencies to be corrected within 72 hours after opening to traffic . <br /> For bicycle paths , straightedge the final Type SP structural layer <br /> with a rolling straightedge , either behind the final roller of the paving train or as a separate <br /> operation . Address all deficiencies in excess of 5/ 16 inch in accordance with 33042 . 5 . If the <br /> Engineer determines that the deficiencies on the bicycle path are due to field geometrical <br /> conditions , the Engineer will waive corrections with no deduction to the pay item quantity . <br /> 33042 .4 . 5 .5 Friction Course Layer : Straightedge the friction course <br /> layer in accordance with 330- 12 . 4 . 2 , either behind the final roller of the paving train or as a <br /> separate operation upon completion of all paving operations . Notify the Engineer of the location <br /> and time of straightedge testing a minimum of 48 hours before beginning testing . The Engineer <br /> will verify the straightedge testing by observing the Quality Control straightedging operations . <br /> Address all deficiencies in excess of 3 / 16 inch in accordance with 330 - 12 . 5 . For laser <br /> acceptance , corrections may be made either before or after laser acceptance testing . <br /> 330- 12 .4 . 6 Acceptance : <br /> 33042 .4. 6. 1 Straightedge Acceptance : For areas of roadways where the <br /> design speed is less than 55 miles per hour, acceptance for pavement smoothness of the friction <br /> course will be based on verified Quality Control measurements using the straightedge as required <br /> by 330- 12 . 4 . 5 . The Engineer will verify the straightedge testing by observing the Quality Control <br /> straightedging operations . <br /> 33042 .4 .6 .2 Laser Acceptance . For areas of high speed roadways where <br /> the design speed is equal to or greater than 55 miles per hour, acceptance testing for pavement <br /> smoothness of the friction course (for mainline traffic lanes only) will be based on the Laser <br /> Profiler. Ramps , acceleration and deceleration lanes , and other areas not suitable for testing with <br /> the Laser Profiler will be tested and accepted with the straightedge in accordance with 330 - <br /> 12 . 4 . 5 . 5 and 330- 12 . 4 . 6 . 1 . <br /> The pavement smoothness of each lane will be determined by a <br /> Laser Profiler furnished and operated by the Department in accordance with FM 5 - 549 and a <br /> report issued with the Ride Number (RN) reported to one decimal place . If corrections are made , <br /> as required following Laser Acceptance , the pavement will not be retested for smoothness using <br /> the Laser Profiler. <br /> For this testing, the pavement will be divided into 0 . 1 mile <br /> segments . Partial segments equal to or greater than 0 . 01 mile will be considered as a 0 . 1 mile <br /> segment. The pavement will be accepted as follows : <br /> 1 ) For segments with a RN greater than or equal to 4 . 0 , the <br /> pavement will be accepted at full pay. <br /> 2) For segments with a RN less than 4 . 0 , the Engineer will <br /> further evaluate the data in 0 . 01 mile intervals for both wheel paths . <br /> If the RN is 3 . 5 or above for all 0 . 01 mile intervals <br /> in both wheel paths , the segment will be accepted at full payment . <br /> If the RN is less than 3 . 5 for one or more 0 . 01 mile <br /> intervals , the segment will be tested with the rolling straightedge in both wheel paths in <br /> accordance with FM 5 - 509 . If approved by the Engineer, this straightedging may be completed <br /> (in both wheel paths) as part of the Quality Control straightedging operations described in 330 . <br /> 12 . 4 . 5 . 5 , prior to testing with the laser profiler. Notify the Engineer of the location and time of <br /> - 79 - <br /> FPID ( S ) : 423186- 1 - 58 - 01 <br /> r <br />