Quality Control split sample for gradation, asphalt binder content and volumetrics in accordance <br /> with 334- 5 . 1 . 1 . Complete all Quality Control testing within one working day from the time the <br /> samples were obtained . <br /> 334-5 .4 .3 Roadway Sampling and Testing Requirements : Obtain five 6 inch <br /> diameter roadway cores within 24 hours of placement at random locations as directed by the <br /> Engineer within each sublot. Test these Quality Control samples for density (Gmb) in accordance <br /> with 334- 5 . 1 . 1 . In situations where it is impractical to cut five cores per sublot, obtain a <br /> minimum of three cores per sublot at random locations as identified by the Engineer. Do not <br /> obtain cores any closer than 12 inches from an unsupported edge . Maintain traffic during the <br /> coring operation ; core the roadway, patch the core holes (within three days of coring) ; and trim <br /> the cores to the proper thickness prior to density testing . <br /> Density for the sublot shall be based on the average value for the cores cut <br /> from the sublot with the target density being the maximum specific gravity (Gmm) of the sublot. <br /> Once the average density of a sublot has been determined, do not retest the samples unless <br /> approved by the Engineer. Ensure proper handling and storage of all cores until the LOT in <br /> question has been accepted. <br /> 334-5 .4.4 Individual Test Tolerances for Quality Control Testing : Terminate <br /> the LOT if any of the following Quality Control failures occur : <br /> 1 ) An individual test result of a sublot for air voids does not meet the <br /> requirements of Table 334 - 5 , <br /> 2) The average sublot density for coarse mixes does not meet the <br /> requirements of Table 334- 5 , <br /> 3 ) Two consecutive test results for gradation (P .200) do not meet the <br /> requirements of Table 334 - 5 , <br /> 4) Two consecutive test results for asphalt binder content do not meet the <br /> requirements of Table 334 - 5 , <br /> 5 ) The average sublot density for two consecutive sublots for fine mixes <br /> does not meet the requirements of Table 334- 5 , <br /> 6) Two core densities for coarse mixes within a sublot are less than <br /> 91 . 00% of Gmm . <br /> When a LOT is terminated due to a QC failure , stop production of the <br /> mixture until the problem is resolved to the satisfaction of the Quality Control Manager(s) and/or <br /> Asphalt Plant Level II technician(s) responsible for the decision to resume production after a <br /> quality control failure, as identified in 105 - 8 . 6 . 4 . In the event that it can be demonstrated that the <br /> problem can immediately be or already has been resolved, it will not be necessary to stop <br /> production . When a LOT is terminated, make all necessary changes to correct the problem. Do <br /> not resume production until appropriate corrections have been made . Inform the Engineer of the <br /> problem and corrections made to correct the problem . After resuming production, sample and <br /> test the material to verify that the changes have corrected the problem. Summarize this <br /> information and provide it to the Engineer prior to the end of the work shift when production <br /> resumes . <br /> In the event that a Quality Control failure is not addressed as defined <br /> above, the Engineer ' s approval will be required prior to resuming production after any future <br /> Quality Control failures . <br /> - 91 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> r., <br />