My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Where density testing for acceptance is not required, compact these <br /> courses (with the exception of open-graded friction courses) in accordance with the rolling <br /> procedure (equipment and pattern) as approved by the Engineer or with Standard Rolling <br /> Procedure as specified in 330- 10 . 1 . 2 . In the event that the rolling procedure deviates from the <br /> procedure approved by the Engineer, or the Standard Rolling Procedure, placement of the mix <br /> shall be stopped . <br /> 01 The density pay factor (as defined in 334- 8 . 2) for LOTs where there are <br /> areas not requiring density testing for acceptance will be prorated based on a pay factor of 1 . 00 <br /> for the quantity (tonnage) of material in areas not requiring density testing for acceptance and the <br /> actual payfactor for <br /> the tonnagee of material in areas s re u <br /> irin density . <br /> 334-5 .2 Full LOTs : Each LOT will be defined (as selected by the Contractor prior to the <br /> start of the LOT) as either ( 1 ) 2 , 000 tons, with each LOT subdivided into four equal sublots of <br /> 500 tons each, or (2) 4 , 000 tons , with each LOT subdivided into four equal sublots of 1 , 000 tons <br /> each . As an exception to this , the initial LOT of all new mix designs shall be defined as <br /> 2 , 000 tons, subdivided into four equal sublots of 500 tons each . Before the beginning of a LOT, <br /> the Engineer will develop a random sampling plan for each sublot and direct the Contractor on <br /> sample points , based on tonnage, for each sublot during construction . <br /> 334-5.3 Partial LOTS : A partial LOT is defined as a LOT size that is less than a full <br /> LOT . A partial LOT may occur due to the following : <br /> 1 . The completion of a given mix type or mix design on a project. <br /> 2 . Closure of the LOT due to time . LOTS will be closed 30 calendar days after the <br /> start of the LOT . Time periods other than 30 calendar days may be used if agreed t <br /> o b both the <br /> Y Y <br /> ln' Y <br /> Engineer and the Contractor. <br /> 3 . A LOT is terminated per 334 - 5 . 4 . 4 . <br /> All partial LOTs will be evaluated based on the number of tests available, and <br /> will not be redefined. <br /> 334-5.4 Quality Control Sampling and Testing : Obtain all samples randomly as <br /> directed by the Engineer. <br /> Should the Engineer determine that the Quality Control requirements are not <br /> being met or that unsatisfactory results are being obtained, or should any instances of <br /> falsification of test data occur, approval of the Contractor ' s Quality Control Plan will be <br /> suspended and production will be stopped. <br /> 334-5.4. 1 Lost or Missing Verification/Resolution Samples : In the event that <br /> any of the Verification and/or Resolution samples that are in the custody of the Contractor are <br /> lost, damaged, destroyed, or are otherwise unavailable for testing, the minimum possible pay <br /> factor for each quality characteristic as described in 334 - 8 . 2 will be applied to the entire LOT in <br /> question, unless called for otherwise by the Engineer. Specifically, if the LOT in question has <br /> more than two sublots , the pay factor for each quality characteristic will be 0 . 55 . If the LOT has <br /> two or less sublots , the pay factor for each quality characteristic will be 0 . 80 . In either event, the <br /> material in question will also be evaluated in accordance with 334 - 5 . 9 . 5 . <br /> If any of the Verification and/or Resolution samples that are in the custody <br /> of the Department are lost, damaged, destroyed or are otherwise unavailable for testing, the <br /> corresponding Quality Control test result will be considered verified, and payment will be based <br /> upon the Contractor ' s data . <br /> 334-5 .4 .2 Plant Sampling and Testing Requirements : Obtain one random <br /> sample of mix per sublot in accordance with 334 - 5 . 1 . 1 as directed by the Engineer . Test the <br /> - 90 - <br /> FPID ( S ) : 4231864 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.