Laserfiche WebLink
If any of the results do not compare favorably, then the Resolution <br /> samples from the LOT will be sent to the Resolution laboratory for testing, as described in <br /> 334- 5 . 6 . <br /> 334-5.5 .2 Roadway Testing : At the completion of each LOT, the Engineer will <br /> determine the density (G, ,b) of each core (previously tested by Quality Control) as described in <br /> 334- 5 . 1 . 1 from the same sublot as the Plant samples . For situations where roadway density is not <br /> required for the random sublot chosen, then another sublot shall be randomly chosen for roadway <br /> density cores only. Results of the testing and analysis for the LOT will be made available to the <br /> Contractor within one working day from the time the LOT is completed. <br /> The individual Verification test results will be compared with individual <br /> Quality Control test results by the Engineer based on the between -laboratory precision values <br /> given in Table 334-6 . <br /> If each of the core test results compare favorably, then the LOT will be <br /> accepted with respect to density, with payment based on the Contractor ' s Quality Control test <br /> data for the LOT . <br /> If any of the results do not compare favorably, then the core samples from <br /> the LOT will be sent to the Resolution laboratory for testing as specified in 334 - 5 . 6 . <br /> 334-5 . 6 Resolution System : <br /> 334-5 . 6. 1 Plant Samples : In the event of an unfavorable comparison between the <br /> Contractor ' s Quality Control test results and the Engineer ' s Verification test results on any of the <br /> properties identified in Table 334 - 6 , the Resolution laboratory will test all of the split samples <br /> from the LOT for only the property (or properties) in question . Resolution samples shall be <br /> reheated at the target roadway compaction temperature for 1 - 1 /2 hours plus or minus 5 minutes , <br /> reduced to the appropriate testing size , and conditioned and tested as described in 334 - 5 . 1 . 1 . <br /> 334-5 . 6 . 2 Roadway Samples : In the event of an unfavorable comparison between <br /> the Contractor ' s Quality Control test data and the Engineer ' s Verification test data on the density <br /> results , the Resolution laboratory will test all of the cores from the LOT . Testing will be as <br /> described in 334- 5 . 1 . 1 . Any damaged roadway cores will not be included in the evaluation; <br /> replace damaged cores with additional cores at the direction of the Engineer. <br /> 334-5 . 6.3 Resolution Determination : The Resolution test results (for the <br /> property or properties in question) will be compared with the Quality Control test results based <br /> on the between- laboratory precision values shown in Table 334 - 6 . <br /> If the Resolution laboratory results compare favorably with all of the <br /> Quality Control results , then acceptance and payment for the LOT will be based on the Quality <br /> Control results , and the Department will bear the costs associated with Resolution testing . No <br /> additional compensation, either monetary or time , will be made for the impacts of any such <br /> testing. <br /> If the Resolution laboratory results do not compare favorably with all of <br /> the Quality Control results , then acceptance and payment for the LOT will be based on the <br /> Resolution test data for the LOT, and the costs of the Resolution testing will be deducted from <br /> monthly estimates . No additional time will be granted for the impacts of any such testing . In <br /> addition, in the event that the application of the Resolution test data results in a failure to meet <br /> the requirements of Table 334- 5 , address any material represented by the failing test result in <br /> accordance with 334- 5 . 9 . 5 . <br /> - 93 - <br /> FPID (S ) : 423186 - 1 - 58 -01 <br /> k <br />