Laserfiche WebLink
ell 11 <br /> 4e I <br /> It It tt <br /> r <br /> In the event of an unfavorable comparison between the Resolution test <br /> results and Quality Control test results , make the necessary adjustments to assure that future <br /> comparisons are favorable . <br /> 334-5 . 7 Independent Verification Testing : <br /> 334-5 . 7 . 1 Plant : The Contractor shall provide sample boxes and take samples as <br /> directed by the Engineer for Independent Verification testing. Obtain enough material for three <br /> complete sets of tests (two samples for Independent Verification testing by the Engineer and one <br /> sample for testing by the Contractor) . If agreed upon by both the Engineer and the Contractor, <br /> only one sample for Independent Verification testing by the Engineer may be obtained. <br /> Independent Verification samples will be reheated at the target roadway compaction temperature <br /> for 1 - 1 /2 hours plus or minus 5 minutes, reduced to the appropriate testing size, and conditioned <br /> and tested as described in 334- 5 . 1 . 1 . The Contractor ' s split sample, if tested immediately after <br /> sampling, shall be reduced to the appropriate testing size, and conditioned and tested as <br /> described in 334- 5 . 1 . 1 . If the Contractor ' s sample is not tested immediately after sampling, then <br /> the sample shall be reheated at the target roadway compaction temperature for 1 - 1 /2 hours plus <br /> or minus 5 minutes , reduced to the appropriate testing size , and conditioned and tested as <br /> described in 334- 5 . 1 . 1 . The Contractor ' s test results shall be provided to the Engineer within one <br /> working day from the time the sample was obtained . <br /> If any of the Independent Verification test results do not meet the <br /> requirements of Table 334- 5 , then a comparison of the Independent Verification test results and <br /> the Contractor ' s test results , if available, will be made . If a comparison of the Independent <br /> Verification test results and the Contractor ' s test results meets the precision values of Table 334 - <br /> 6 for the material properties in question, or if the Contractor ' s test results are not available , then <br /> the Independent Verification test results are considered verified and the Contractor shall cease <br /> production of the asphalt mixture until the problem is adequately resolved (to the satisfaction of <br /> the Engineer) , unless it can be demonstrated to the satisfaction of the Engineer that the problem <br /> can immediately be (or already has been) resolved . Address any material represented by the <br /> failing test results in accordance with 334- 5 . 9 . 5 <br /> If a comparison of the Independent Verification test results and the <br /> Contractor ' s test results does not meet the precision values of Table 334 - 6 for the material <br /> properties in question , then the second Independent Verification sample shall be tested by the <br /> Engineer for the material properties in question . If a comparison between the first and second <br /> Independent Verification test results does not meet the precision values of Table 334- 6 for the <br /> material properties in question, then the first Independent Verification test results are considered <br /> unverified for the material properties in question and no action shall be taken. <br /> If a comparison between the first and second Independent Verification test <br /> results meets the precision values of Table 334 -6 for the material properties in question, then the <br /> first Independent Verification sample is considered verified and the Contractor shall cease <br /> production of the asphalt mixture until the problem is adequately resolved (to the satisfaction of <br /> the Engineer) , unless it can be demonstrated to the satisfaction of the Engineer that the problem <br /> can immediately be (or already has been) resolved . Address any material represented by the <br /> failing test results in accordance with 334- 5 . 9 . 5 . <br /> The Engineer has the option to use the Independent Verification sample <br /> for comparison testing as specified in 334 - 6 . <br /> 334-5 . 7. 2 Roadway : Obtain five 6 inch diameter roadway cores within 24 hours <br /> of placement, as directed by the Engineer, for Independent Verification testing . In situations <br /> - 94- <br /> FPID ( S ) : 423186A1 58 -01 <br /> } <br />