S <br /> where it is impractical to cut five cores per sublot, obtain a minimum of three cores per sublot at <br /> random locations , as identified by the Engineer. These independent cores will be obtained from <br /> the same LOTs and sublots as the Independent Verification Plant samples , or as directed by the <br /> Engineer. The density of these cores will be obtained as described in 334 - 5 . 1 . 1 . If the average of <br /> the results for the sublot does not meet the requirements of Table 334 - 5 for density, cease <br /> production of the asphalt mixture until the problem is adequately resolved (to the satisfaction of <br /> the Engineer) , unless it can be demonstrated to the satisfaction of the Engineer that the problem <br /> can immediately be (or already has been) resolved. Address any material represented by the <br /> failing test results in accordance with 334- 5 . 9 . 5 . <br /> 334-5 .8 Surface Tolerance : The asphalt mixture will be accepted on the roadway with <br /> respect to surface tolerance in accordance with the applicable requirements of 330 - 12 . <br /> 334-5 . 9 Minimum Acceptable Quality Levels : <br /> 334-5. 9 . 1 Pay Factors Below 0 . 90 : In the event that an individual pay factor for <br /> any quality characteristic of a LOT falls below 0 . 90 , take steps to correct the situation and report <br /> the actions to the Engineer. In the event that the pay factor for the same quality characteristic for <br /> two consecutive LOTs is below 0 . 90 , cease production of the asphalt mixture until the problem is <br /> adequately resolved (to the satisfaction of the Engineer), unless it can be demonstrated to the <br /> satisfaction of the Engineer that the problem can immediately be (or already has been) resolved. <br /> Actions taken must be approved by the Engineer before production resumes . <br /> 334-5 .9 .2 Composite Pay Factors Less Than 0 .90 and Greater Than or Equal <br /> to 0 .80 : If the composite pay factor for the LOT is less than 0 . 90 and greater than or equal to <br /> 0 . 80 , cease production of the asphalt mixture until the problem is adequately resolved (to the <br /> satisfaction of the Engineer) , unless it can be demonstrated to the satisfaction of the Engineer <br /> that the problem can immediately be (or already has been) resolved. Actions taken must be <br /> approved by the Engineer before production resumes . <br /> 334-5 .9 .3 Composite Pay Factors Less Than 0 .80 and Greater Than or Equal <br /> to 0 . 75 % If the composite pay factor for the LOT is less than 0 . 80 and greater than or equal to <br /> 0 . 75 , address the defective material in accordance with 334 - 5 . 9 . 5 . <br /> 334-5 .9 .4 Composite Pay Factors Less Than 0 .75 : If the composite pay factor <br /> for the LOT is less than 0 . 75 , remove and replace the defective LOT at no cost to the <br /> Department, or as approved by the Engineer. <br /> 334-5 .9 .5 Defective Material : Assume responsibility for removing and replacing <br /> all defective material placed on the project, at no cost to the Department . <br /> As an exception to the above and upon approval of the Engineer, <br /> obtain an engineering analysis by an independent laboratory (as approved by the Engineer) to <br /> determine the disposition of the material . The engineering analysis must be signed and sealed by <br /> a Professional Engineer licensed in the State of Florida. <br /> The Engineer may determine that an engineering analysis is not <br /> necessary or may perform an engineering analysis to determine the disposition of the material . <br /> Any material that remains in place will be accepted with a <br /> composite pay factor as determined by 334 - 8 , or as determined by the Engineer. <br /> If the defective material is due to a gradation, asphalt binder <br /> content or density failure , upon approval of the Engineer the Contractor may perform delineation <br /> tests on roadway cores in lieu of an engineering analysis to determine the limits of the defective <br /> material that requires removal and replacement . Prior to any delineation testing, all sampling <br /> locations shall be approved by the Engineer. All delineation sampling and testing shall be <br /> - 95 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> r � <br />