My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
monitored and verified by the Engineer. The minimum limit of removal of defective material is <br /> fifty- feet either side of the failed sample . For materials that are defective due to air voids , an <br /> engineering analysis is required. <br /> When evaluating defective material by engineering analysis or <br /> delineation testing, at a minimum, evaluate all material located between passing Quality Control , <br /> Process Control or Independent Verification test results . Exceptions to this requirement shall be <br /> approved by the Engineer. <br /> 334-6 Comparison Testing. <br /> At the start of the project (unless waived by the Engineer) and at other times as <br /> determined necessary by the Engineer, provide split samples for comparison testing with the <br /> Engineer. The purpose of these tests is to verify that the testing equipment is functioning <br /> properly and that the testing procedures are being performed correctly. In the event that the <br /> Engineer determines that there is a problem with the Contractor ' s testing equipment and/or <br /> testing procedures , immediately correct the problem to the Engineer ' s satisfaction . In the event <br /> that the problem is not immediately corrected, cease production of the asphalt mixture until the <br /> problem is adequately resolved to the satisfaction of the Engineer. <br /> If so agreed to by both the Contractor and the Engineer, the split sample used for <br /> comparison testing may also be used for the Quality Control sample . The split sample used for <br /> comparison testing will also meet the requirements for Independent Verification Testing <br /> described in 334- 5 . 7 . <br /> 334.7 Method of Measurement. <br /> For the work specified under this Section (including the pertinent provisions of <br /> Sections 320 and 330) , the quantity to be paid for will be the weight of the mixture, in tons . The <br /> pay quantity will be based on the project average spread rate, excluding overbuild, limited to a <br /> maximum of 105 % of the spread rate determined in accordance with 334 - 1 . 4 or as set by the <br /> Engineer. The project average spread rate is calculated by totaling the arithmetic mean of the <br /> average daily spread rate values for each layer. <br /> The bid price for the asphalt mix will include the cost of the liquid asphalt or the asphalt <br /> recycling agent and the tack coat application as directed in 300 - 8 . There will be no separate <br /> payment or unit price adjustment for the asphalt binder material in the asphalt mix . For the <br /> calculation of unit price adjustments of bituminous material, the average asphalt content will be <br /> based on the percentage specified in 9 -2 . 1 . 2 . The weight will be determined as provided in 320 -2 <br /> (including the provisions for the automatic recordation system) . <br /> Prepare a Certification of Quantities , using the Department ' s current approved form, for <br /> the certified Superpave asphalt concrete pay item . Submit this certification to the Engineer no <br /> later than Twelve O ' clock noon Monday after the estimate cut- off or as directed by the Engineer, <br /> based on the quantity of asphalt produced and accepted on the roadway per Contract . The <br /> certification must include the Contract Number, FPID Number, Certification Number, <br /> Certification Date , period represented by Certification and the tons produced for each asphalt pay <br /> item . <br /> 334-8 Basis of Payment. <br /> 334- 8 . 1 General : Price and payment will be full compensation for all the work specified <br /> under this Section (including the applicable requirements of Sections 320 and 330) . <br /> - 96- <br /> FPID ( S ) : 4231864 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.