My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:14:52 PM
Creation date
10/1/2015 3:10:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B
Agenda Item Number
8.N.
Entity Name
Goodson Paving Old Dixie Highway Sidewalk
Subject
Old Dixie Highway Sidewalk Improvements
Volume I
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10417
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIE <br /> ' In In <br /> nIk <br /> PI <br /> ' In In <br /> 1 . St . Johns River Water Management District - Permit no 400-061 - 126858 - 1 <br /> 2 . Indian River Farms Water Control District — Permit no 1041 <br /> B . The CONTRACTOR shall obtain and pay for all other required permits and <br /> licenses . The CONTRACTOR shall provide copies of the permits to the <br /> OWNER and ENGINEER and shall comply with all conditions contained in <br /> the permits at no extra cost to the OWNER . <br /> C . The CONTRACTOR shall be familiar with all permit requirements during <br /> construction and shall be responsible for complying with these <br /> requirements . The cost of this effort shall be included in the pay item in <br /> which the work is most closely associated with . <br /> SC - 13 . 03 Test and Inspections <br /> SC- 13 . 03 . 8 . Delete the first sentence of paragraph GC43. 03. 8 in its entirety, and insert the <br /> following sentences in its place: <br /> A . Contractor shall employ and pay for the services of an independent testing <br /> laboratory to perform all initial inspections , tests , or approvals required by the <br /> Contract Documents , testing shall be done in accordance with the FDOT <br /> Sampling, Testing and Reporting Guide by Material Description and the <br /> FDOT Materials Manual (Topic No. 675-000-000) . FDOT Standard <br /> Specifications for Road and Bridge Construction ( including all modification such <br /> as supplemental and special provisions ) must be used . The Owner will be <br /> responsible for all project level inspection , verification testing , and insuring all <br /> data is entered into LIMS ( Laboratory Information Management System ) , <br /> 13 . 05 OWNER May Stop the Work <br /> SC- 13 . 05 . A. Delete paragraph GC- 13. 05. A in its entirety and insert the following paragraph in its <br /> place: <br /> A . If the Work is defective , or CONTRACTOR fails to supply sufficient skilled <br /> workers or suitable materials or equipment , or fails to comply with permit <br /> requirements , or fails to comply with the technical specifications , or fails to <br /> perform the Work in such a way that the completed Work will conform to the <br /> Contract Documents , OWNER may order CONTRACTOR to stop the Work , or any <br /> portion thereof, until the cause for such order has been eliminated ; however, this <br /> right of OWNER to stop the Work shall not give rise to any duty on the part <br /> of <br /> OWNER to exercise this right for the benefit of CONTRACTOR , any <br /> Subcontractor, any Supplier, any other individual or entity, or any surety for, or <br /> employee or agent of any of them . <br /> 14 . 02 Progress Payments <br /> 00800-7 <br /> 00800 - Supplementary Conditions 06-09 rev. doc <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0845-Old Dixie Hwy Sidewalk US1 _69th ( LAP)\Admim\bid <br /> documents\00800 - Supplementary Conditions 06-09 rev. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.