My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:14:52 PM
Creation date
10/1/2015 3:10:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B
Agenda Item Number
8.N.
Entity Name
Goodson Paving Old Dixie Highway Sidewalk
Subject
Old Dixie Highway Sidewalk Improvements
Volume I
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10417
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC- 14 . 02 . 13 . 5 . Delete paragraph GC44. 02. B. 5. d in its entirety and insert the following paragraph <br /> in its place: <br /> d . ENGINEER has actual knowledge of the occurrence of any of the events <br /> enumerated in paragraph 15 . 02 . A ; or <br /> SC- 14 . 02 . 13 . 5 . Add the following sentences at the end of paragraph GC- 14. 02. 8. 5: <br /> e . OWNER has been required to pay ENGINEER additional compensation because <br /> of CONTRACTOR delays or rejection of defective Work ; or <br /> f. OWNER has been required to pay an independent testing laboratory for <br /> subsequent inspections , tests , or approvals taken after initial failing <br /> inspections , tests , or approvals . <br /> SC- 14 . 02 . C . 1 . Delete paragraph GC44 . 02. C. 1 in its entirety and insert the following <br /> paragraph in its place : <br /> C . Payment Becomes Due <br /> 1 . Payment shall be made by OWNER to CONTRACTOR according to the Local <br /> Government Prompt Payment Act . F . S . 218 . 70 et. seq . <br /> SC - 14 . 04A . After the third sentence in paragraph GC44. 04A of the General Conditions, <br /> delete the remainder of paragraph 14. 04A in its entirety and replace with the following: <br /> " If Engineer considers the Work substantially complete , Engineer will prepare <br /> and deliver to Owner a tentative certificate of Substantial Completion that shall fix <br /> the date of Substantial Completion . In accordance with the provisions of Florida <br /> Statutes section 208 . 735 ( 7 ) ( x ) (2005 ) , upon receipt of the tentative certificate of <br /> Substantial Completion from Engineer, the Owner, the Engineer, and the <br /> Contractor shall conduct a walk-through inspection of the Project to document a <br /> list of any items required to render the Work on the Project complete , <br /> satisfactory , and acceptable under this Agreement ( herein the " Statutory List" ) . <br /> The Statutory List shall be reduced to writing and circulated among the Owner, <br /> the Engineer, and the Contractor by the Owner or the Engineer within 30 <br /> calendar days after substantial completion . The Owner and Contractor <br /> acknowledge and agree that: 1 ) the failure to include any corrective work , or <br /> pending items that are not yet completed , on the Statutory List does not alter the <br /> responsibility of the Contractor to complete all of the Work under this Agreement ; <br /> 2 ) upon completion of all items on the Statutory List , the Contractor may submit a <br /> pay request for all remaining retainage except as otherwise set forth in this <br /> Agreement ; and 3 ) any and all items that require correction under this Agreement <br /> and that are identified after the preparation of the Statutory List remain the <br /> obligation of the Contractor to complete to the Owner' s satisfaction under this <br /> Agreement . After receipt of the Statutory List by the Contractor , the Contractor <br /> acknowledges and agrees that it will diligently proceed to complete all items on <br /> the Statutory List and schedule a final walk-through in anticipation of final <br /> completion on the Project . " <br /> SC - 14 . 0413 Add the following new paragraph immediately after paragraph GC 14. 046: <br /> C . At the time of delivery of the tentative certificate of Substantial Completion , Engineer will <br /> deliver to Owner and Contractor a written recommendation as to division of responsibilities <br /> 00800-8 <br /> 00800 - Supplementary Conditions 06-09 rev. doc <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0845-Old Dixie Hwy Sidewalk USI -69th ( LAP )\Admim\bid <br /> documents\00800 - Supplementary Conditions 06-09 rev. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.