My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:14:52 PM
Creation date
10/1/2015 3:10:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B
Agenda Item Number
8.N.
Entity Name
Goodson Paving Old Dixie Highway Sidewalk
Subject
Old Dixie Highway Sidewalk Improvements
Volume I
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10417
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV <br /> pending final payment between Owner and Contractor with respect to security , operation , <br /> safety , and protection of the Work , maintenance , heat , utilities , insurance , and warranties and <br /> guarantees <br /> SC - 14 . 07 Final Payment <br /> SC- 14 . 07 . C . 1 . Delete paragraph GC44. 07. C. 1 in its entirety and insert the following <br /> paragraph in its place: <br /> C . Payment Becomes Due <br /> 1 . Payment shall be made by OWNER to CONTRACTOR according to the " Local <br /> Government Prompt Payment Act" , Florida Statutes section 218 . 70 , et . seq . <br /> SC -15 . 01 OWNER May Suspend Work <br /> SC- 15 . 01 . A Delete the last sentence in paragraph GC45. 01 . A and insert the following in its <br /> place: <br /> CONTRACTOR shall be allowed an extension of the Contract Times , directly attributable to any <br /> such suspension if CONTRACTOR makes a Claim for an extension as provided in paragraph <br /> 10 . 05 . CONTRACTOR shall not be allowed an adjustment of the Contract Price and <br /> CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other eco- <br /> nomic loss arising out of or resulting from such Work suspension . <br /> SC -15 . 02 OWNER May Terminate For Cause <br /> SC- 15 . 02 . A . 5 and SC- 15 . 02 . A. 6 Add the following new paragraphs immediately after <br /> paragraph GC- 15. 02. A . 4: <br /> 5 . CONTRACTOR ' s violation of Section 02225 — " Erosion Control and Treatment of <br /> Dewatering Water From the Construction Site . " <br /> 6 . CONTRACTOR' s failure to make payment to Subcontractors or Suppliers for <br /> materials or labor in accordance with the respective agreements between the <br /> CONTRACTOR and the Subcontractors or Suppliers . <br /> SC -15 . 04 CONTRACTOR May Stop Work or Terminate <br /> SC- 15 . 04 Delete the following text from the first sentence of paragraph GC- 15. 04. A : <br /> SC- 15 . 04 Delete the following text from the second sentence of paragraph GC- 15. 04. A : <br /> er OWNER has failed fel; 30 days to pay GON 'rRACTOR Ry s6IFR f a <br /> Rally detem; iRed te be <br /> d� <br /> SC - 16 DISPUTE RESOLUTION <br /> SC - 16 . 02 Mediation <br /> 00800-9 <br /> 00800 - Supplementary Conditions 06-09 rev . doc <br /> F :\PublicWorks\ENGINEERING DIVISION PROJECTS\0845-Old Dixie Hwy Sidewalk US1 _69th ( LAP )\Admim\bid <br /> documents\00800 - Supplementary Conditions 06-09 rev . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.