Laserfiche WebLink
CLARIFICATIONS / CORRECTIONS/QUESTIONS : <br /> 1 ) All phases of the Maintenance of Traffic ( MOT ) plan shall be submitted for review and approval by- the <br /> Indian River CountyTraffic Division , The MOT is not required to be certified by a registered <br /> Professional Engineer. <br /> 2 ) Line Item 285 -704, ( 6" CEMENTED COQUINA SHELL BASE ( OR OPTIONAL BASE GROUP 7 ) shall be <br /> amended to read ( 6" CEMENTED COQUINA SHELL BASE ( OR OPTIONAL BASE GROUP 4 ) <br /> 3 ) Line Item 285 -707, ( 8" CEMENTED COQUINA SHELL BASE ( OR OPTIONAL BASE GROUP 7 ) shall be <br /> amended to read ( 8" CEMENTED COQUINA SHELL BASE ( OR OPTIONAL BASE GROUP 6 ) <br /> 4 ) Concrete sidewalks shall be minimum 3000psi , 6" thick with no reinforcement . All other poured - in - <br /> place concrete ( parking, turnouts or driveways ) shall be minimum 3000 psi , 6" thick with fibrous <br /> concrete reinforcement . Welded wire mats are not required . <br /> 5 ) Soil test reports by Fraser Engineering and Testing, Inc. will be posted on the Indian River County FTP <br /> site . FTP SITE INSTRUCTIONS : <br /> a ) ftp ://ftp . ircgov . com <br /> b ) User name : publicworks <br /> c ) Password : pwftp <br /> d ) 9810- 13 66th Avenue Phase 2 / Addendum 1 <br /> i ) Fraser Report ( Feb 1999 ) pdf <br /> ii ) Fraser Report ( Feb 2000 ) pdf <br /> 6 ) Some plan sets in the bid documents were missing Sheet 39 , Sheet 39 will be included in this <br /> addendum . <br /> 7 ) IRC Utility services : <br /> a ) Modified " Utility Adjustments" in Itemized Bid schedule . <br /> b ) Sheet 11 — Modified Water and Wastewater "Tabulation of Quantities" and added Water and <br /> Force Main Utility Pay Item Note . <br /> c ) Sheet 22 — Eliminated 234 Feet of 4 inch Water Pipe , Relocated Blow off. <br /> d ) Sheet 23 — Added one 2- inch Water Service Relocation . Added note to plug existing water service <br /> corporation stops on water services to be relocated . <br /> e ) Sheet 25 — Added temporary linestop valve on both 5th Street and 5th Place . <br /> f) Sheet 29 — deleted & inch water pipe extension west along 8th Street . Relocated south end of <br /> proposed 14/2 — inch water service . <br /> g ) Sheet 61 — Added 6 - inch force main pipe extension note for clarity. Deleted water conflict <br /> crossing at Sta 16+00 on 81h Street . Added water conflict crossing at Sta 17 + 25 on 8th Street . <br /> h ) Sheet 62 — Deleted water conflict crossing at Sta 19+ 00 on 8th Street . <br /> i ) Sheet WC4 — Added Addendum No . 2 Construction notes . <br /> J ) Sheet W& 6 — Deleted water conflict crossing at Sta 16+ 00 on 81h Street . Added water conflict <br /> crossing at Sta 17 +25 on 8th Street . <br /> k ) Sheet W& 7 — Deleted water conflict crossing at Sta 19 + 00 on 8th Street <br /> 1 ) Sheet W& 8 — Added one temporary linestop valve on both 5th Street and 5th Place . <br /> Page 2 of S <br /> F \Public WorksIENGINEERING DIVISION PROJECTS\9910B Wh Ave Ph 2 41h St to 16th SI\Admlm\ADDENDUMS\Addcndum No. 2, 2-24- 12.doc <br />