Laserfiche WebLink
i <br /> ATTACHMENT 1 to WORK ORDER NUMBER PCS= 1 <br /> PILOT ALGAL TURF SCRUBBER SYSTEM FOR PC SOUTH <br /> SCOPE OF WORK <br /> The COUNTY has requested that the CONSULTANT provide , install , and operate a <br /> pilot algal turf scrubber system for the COUNTY ' s PC ( Pollution Control) South Project . <br /> The Work is more particularly described below . <br /> 1 Algal Turf Scrubber® Field Investigation ( Pilot) Program <br /> Introduction <br /> The pilot scale investigation of the Algal Turf Scrubber@ (ATSTM ) will simulate the <br /> ATSTM treatment process specific to the water quality conditions associated with the <br /> blending of water from the South Relief Canal and a Reverse Osmosis Concentrate <br /> Water . The results will be used to ( i ) refine periphyton growth and water treatment <br /> projections and ( ii ) optimize the design of a full -scale Algal Turf Scrubber@ Water <br /> Pollution Control Facility . <br /> The CONSULTANT shall furnish , install , and operate a pilot scale ATSTM system for a <br /> 6 - month period . Influent water shall be a blend of water from the South Relief Canal <br /> ( managed by the Indian River Farms Water Control District or IRFWCD) and an RO <br /> concentrate generated by the Indian River County Utilities Department ( Utilities <br /> Department) . The blend will be such that it is emulative of the expected mix when the <br /> two waters are introduced through discharge of the concentrate into the South Relief <br /> Canal . This blend is expected to be 6 : 1 to 10 : 1 canal water to Concentrate . The Algal <br /> Turf Scrubber@ Mobile Pilot Unit ( MPU ) will be as shown in Figure 1 : <br /> The MPU consists of an aluminum ATSTM floway with support structure , self- <br /> siphoning surger , effluent box , 40 mil EPDM base , and a geotextile grid . <br /> ® The MPU floways shall be installed at a design slope of 0 . 5 % . The floway <br /> shall have a width of 1 feet and a length of 500 feet . <br /> ® Inflow water samples shall be collected weekly from the surger reservoir via a <br /> time interval refrigerated autosampler and via grab samples for short hold <br /> time parameters . ( See Table 1 ) <br /> i Outflow samples shall be collected weekly from the effluent sump via a <br /> second time interval autosampler and via grab samples for short hold time <br /> parameters . ( See Table 1 ) <br /> S Water from the South Relief Canal will be analyzed for key parameters via <br /> grab samples collected biweekly . ( See Table 1 ) <br /> Concentrate will be analyzed for key parameters via grab samples collected <br /> biweekly . ( See Table 1 ) <br /> Testing required through the FDEP Permit 31 FL0037940 issued to the <br /> Utilities Department will be collected via a third autosampler . ( See Table 1 ) <br /> 2 <br /> fApublic works\keithm\stormwater projects\south relief canal screening system and ats\work orders\hydromentia work order pcs- 1 - <br /> pilot plant - 8-23-2010 . doc <br />