Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Task 3 ATSTM Mobile Pilot Unit and Water Delivery System Installation <br /> Install the ATSTM MPU as specified in the layout and design . Upon completion of the <br /> installation confirm operability of the system . Specific elements to be provided and <br /> installed include but are not limited to : <br /> ATSTM Mobile Pilot Unit <br /> Self priming centrifugal pump and associated support station for canal water <br /> Intake piping , fittings and valving associated with the canal water pump station <br /> Influent force main and valving for canal water <br /> Connection to influent piping and fittings associated with concentrate to surger <br /> discharge <br /> • Influent and effluent ultrasonic flow meter for canal water force main and effluent <br /> line <br /> Y Temporary security fencing around the MPU <br /> Effluent piping and valving <br /> ® Influent and Effluent sampling stations <br /> Task 4 A TS TM Mobile Pilot Unit AutoSamplers <br /> Provide , install , program , maintain , and operate two (2 ) time interval refrigerated <br /> autosamplers for collection of samples from the system inflow and outflow , with <br /> associated tubing , bottles , cleaning materials , desiccants and spare parts . Provide a <br /> third non - refrigerated time interval sampler with all associated parts and equipment for <br /> toxicity testing . <br /> Tasks 5 10 AT Pilot Operation, Water Quality Sampling, System Enpineerinco <br /> and Optimization ; Water/Tissue Testing and Analysis <br /> Manage , maintain and operate the field test unit for a period of 6 months (26 weeks) . <br /> The COUNTY shall be responsible for placement of any Concentrate storage tanks , <br /> concentrate force main with valving and controls , and timely delivery of concentrate , <br /> and provision and replacement as required of concentrate pump , valving , and flow <br /> metering . <br /> Follow the Algal Turf Scrubber® (ATSTM) Pilot Program Plan of Study Indian River <br /> County South Relief Canal , prepared by the CONSULTANT and dated June 2010 <br /> ( Revised August 19 , 2010 ) and incorporated herein by reference . <br /> The CONSULTANT' s representative will visit the site no less than once weekly during <br /> the course of the field investigation to provide required operational services . <br /> Operational services shall include recovery , preparation , and delivery of water samples <br /> ( See Tables 1 and 2 ) and maintenance of QA records . Services shall also include algal <br /> biomass recovery ; quantification of the harvest , and solids determination of harvest <br /> sample ; preparation and shipment of plant samples to the designated independent <br /> 5 <br /> f1public works\keithm\stormwater projects\south relief canal screening system and ats\work orders\hydromentia work order pcs- 1 - <br /> pilot plant - 8-23-2010 . doc <br />