Laserfiche WebLink
Cleaned Equipment Blanks every four months) to be analyzed for TKN-N, Nitrate/Nitrite- <br />N, Total Phosphorus, field filtered Ortho -Phosphorus, Ammonia -Nitrogen, Total <br />Suspended Solids, Alkalinity, Total Organic Carbon, Color, Biochemical Oxygen <br />Demand, Cadmium, Chromium, Copper, and Zinc. <br />Effluent from ATST""0 17 composite samples (4 to be replicate samples) to be analyzed <br />for TKN-N, Nitrate/Nitrite-N, and Total Phosphorus <br />Effluent from ATSTM : 17 grab samples (4 to be replicate samples) to be analyzed for <br />field filtered Ortho -Phosphorus, Ammonia -Nitrogen, Total Suspended Solids, Alkalinity, <br />Total Organic Carbon, Color, Biochemical Oxygen Demand, Cadmium, Chromium, <br />Copper, and Zinc. <br />Effluent from ATSTM : 6 grab samples (Equipment Blanks every four months, Field <br />Cleaned Equipment Blanks every four months) to be analyzed for TKN-N, Nitrate/Nitrite- <br />N, Total Phosphorus, field filtered Ortho -Phosphorus, Ammonia -Nitrogen, Total <br />Suspended Solids, Alkalinity, Total Organic Carbon, Color, Biochemical Oxygen <br />Demand, Cadmium, Chromium, Copper, and Zinc. <br />Effluent from Woodstork Habitat Wetland: 17 composite samples (4 to be replicate <br />samples) to be analyzed for TKN-N, Nitrate/Nitrite-N, and Total Phosphorus <br />Effluent from Woodstork Habitat Wetland: 17 grab samples (4 to be replicate <br />samples) to be analyzed for field filtered Ortho -Phosphorus and Total Dissolved <br />Phosphorus, Ammonia -Nitrogen, Total Suspended Solids, Alkalinity, Total Organic <br />Carbon, Color, Biochemical Oxygen Demand, Cadmium, Chromium, Copper, and Zinc. <br />Effluent from Woodstork Habitat Wetland: 6 grab samples (Equipment Blanks every <br />four months, Field Cleaned Equipment Blanks every four months) to be analyzed for <br />TKN-N, Nitrate/Nitrite-N, Total Phosphorus, field filtered Ortho -Phosphorus and Total <br />Dissolved Phosphorus, Ammonia -Nitrogen, Total Suspended Solids, Alkalinity, Total <br />Organic Carbon, Color, Biochemical Oxygen Demand, Cadmium, Chromium, Copper, <br />and Zinc. <br />Post -Rake Harvest Diversion Flows: 26 composite samples to be analyzed for TSS. <br />Post -Rake Harvest Diversion Flows: 12 composite samples to be analyzed for TKN- <br />N, Nitrate/Nitrite-N, and Total Phosphorus <br />Over one year's operation, 69 analyses will be required for the parameter list noted in <br />Table 1 for the listed sites; except for total suspended solids of which there will be 95 <br />samples; and TKN-N, Nitrate/Nitrite, and Total Phosphorus, of which there will be 81 <br />samples. The CONSULTANT will not be responsible for sample collection or shipping, <br />which will be done by COUNTY personnel. The CONSULTANT, through its contract <br />with the laboratory will provide sampling bottles, preserved and labeled appropriately, <br />and shipping containers. <br />3 <br />Odocuments and settings\wsawyer\local settings\temporary internet files\olk66\work order no 3 - hydromentia - 6-21-2010 (2).doc <br />