My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-122
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 10:32:29 AM
Creation date
10/1/2015 4:31:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/03/2012
Control Number
2012-122
Agenda Item Number
8.G.
Entity Name
Hydromentia Inc.
Subject
Change Order No.4 South Relief Canal Algal Turf Scrubber
Area
Indian River County PC South Algal Nutrient Removal Facility
Supplemental fields
SmeadsoftID
11284
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Hydro " ° '� � '� � South Relief Canal Algal Turf Scrubber® <br /> Task 2 : Structural Engineering <br /> HydroMentia shall contract with and support Southeast Structural Engineers , Inc . to provide <br /> construction documents and technical specifications for concrete structures as specified in <br /> Attachment A . Southeast Structural Engineers , Inc . is the same structural engineering <br /> company that designed the County' s Egret Marsh Stormwater Park , which is very similar to <br /> PC South and therefore , it is already intimately familiar with the project' s design <br /> requirements and constraints . <br /> Task 3 : Electrical Design <br /> HydroMentia shall contract with and support Wandover Consulting Engineers LLC to <br /> provide electrical design , drawings and coordination as specified in Attachment B . <br /> Task 4 : Present Worth Economic Evaluation <br /> HydroMentia shall complete a Present Worth ( PW ) Economic Evaluation for a 25 and 50 <br /> year horizon for the proposed pumping facilities and force mains to be attendant with the <br /> proposed South Canal ATSTM facility . This PW evaluation will facilitate objective <br /> comparison of two alternative designs—one oriented around a 24 "- 30" force main and one <br /> oriented around a 30 " force main . The PW methodology will be done in conformance with <br /> accepted methodologies as used in evaluations conducted for the USEPA , and as applied <br /> by the South Florida Water Management District ( SFWMD ) in its evaluation of <br /> supplemental water treatment technologies in Everglades projects . Unit pricing will be <br /> developed from updated costs as applicable to the existing construction market in Florida . <br /> Selection of materials and pumping strategies will be coordinated through those presently <br /> involved in system design for this project . Applied interest rates will be the latest EPA <br /> established rates . A letter report , complete with supporting information and engineering <br /> calculations will be prepared and submitted to the County , with a table indicating the <br /> comparative PW costs . <br /> I FEE SCHEDULE <br /> Payment for services for Tasks 1 through 4 shall be based upon the amounts and <br /> deliverables presented in Table 1 . Total maximum proposed fee is $ 83 , 990 . Tasks 1 and <br /> 4 shall be billed on an hourly rate plus expenses up to the not-to- exceed amounts listed in <br /> the table . Tasks 2 and 3 shall be lump sum amounts as specified in Table 1 and <br /> Attachments 1 and 2 . HydroMentia professional services required in conjunction with <br /> Tasks 2 and 3 shall be billed on an hourly rate plus expenses up to the not to exceed <br /> amounts listed in Table 1 and Attachments A and B . HydroMentia professional fees shall <br /> be as provided in the Time and Expense Rate Schedule included as Attachment C . <br /> Indian River County ATSTm Engineering Services Proposal 2 <br /> April 27 , 2012 ( Rev June 20 , 2012 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.