Laserfiche WebLink
PROPOSAL <br /> EXHIBIT " Aly <br /> WORK ORDER N0 . 1 <br /> ( Engineering /Survey ) Continuing Professional Surveying & Mapping / GIS Services , <br /> Indian River County Contract No . 1032 , 2010 -2012 <br /> Indian River County Project No . 1049 8th Street Route Survey <br /> Indian River County Work Order No . 1 <br /> Project Limits : <br /> 8th Street between 20th Avenue and 58th Avenue ( 2 . 5 +/- miles ) <br /> Right-of-Way Mapping and Topographic Survey Services performed within parts of Section 9 , 10 and 11 , <br /> Township 33 South , Range 39 East , Indian River County, Florida . <br /> Project Scope . <br /> The SURVEYOR shall provide Professional Land Surveying services to include the following : <br /> 1 ) Establish horizontal control network along +/- 13 , 200 feet within the ( Moderate Traffic — Residential Area ) <br /> Right-of-Way corridor with ties to existing Indian River County Horizontal Control Monument along or <br /> closely adjacent to the project corridor <br /> 2 ) Establish horizontal and baseline control of project to Florida State Plane Coordinate System , East Zone , <br /> NAD 83/07 . <br /> 3 ) Establish baseline and possible offset baseline of Right-of-Way. Set nail and disks ( or sufficient <br /> monumentation ) at all centerline points of intersection PC ' s , PI ' s , PT' s and at intervals not to exceed 1 , 000 <br /> feet . <br /> 4 ) Reference Baseline Points , with a minimum of 3 points ( preferably 4 points - 2 sets of <br /> 2 points ) set <br /> perpendicular to the baseline and outside of the existing Right-of-Way . <br /> 5 ) Establish and set vertical benchmarks along the topographic route right of way survey not to exceed 700 <br /> feet intervals . Benchmarks to be established to Indian River County Vertical Control Datum in NGVD 29 , <br /> with conversion stated to NAVD 88 . <br /> 6 ) Locate and / or establish block corners , lot corners , recover / re-survey section and 1 /4 section corners <br />, <br /> ties to government lot and section lines along and intersecting the right-of-way corridor. <br /> 7 ) Recover and verify any existing Right-of-Way Maps of the corridor. <br /> 8 ) Prepare Certified Corner Reports ( CCR ) or update on all found , used and or established sectional control <br /> throughout the project <br /> 9 ) Tie into and / re-establish alignment of existing control right-of-way maps at major roadway intersections . <br /> F : Tngineering\Tom Croon qu ist\Pri vate\B CC Agenda Items\2011 \1 1 -05 -05 8th Street 1049 - 58th Ave to 20th Ave - Route Survey - IRS\Consent <br /> Agenda Support Docs\ I 1 -05 -09 IRS Proposal . doc <br />