My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-115
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:27:42 PM
Creation date
10/1/2015 2:38:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/17/2011
Control Number
2011-115
Agenda Item Number
8.E.
Entity Name
Indian River Survey Inc.
Subject
Route Survey
Area
8th St. (Glendale Road) from 58th Ave. to 20th Ave.
Project Number
1049
Supplemental fields
SmeadsoftID
9914
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br /> EXHIBIT " Aly <br /> WORK ORDER N0 . 1 <br /> ( Engineering /Survey ) Continuing Professional Surveying & Mapping / GIS Services , <br /> Indian River County Contract No . 1032 , 2010 -2012 <br /> Indian River County Project No . 1049 8th Street Route Survey <br /> Indian River County Work Order No . 1 <br /> Project Limits : <br /> 8th Street between 20th Avenue and 58th Avenue ( 2 . 5 +/- miles ) <br /> Right-of-Way Mapping and Topographic Survey Services performed within parts of Section 9 , 10 and 11 , <br /> Township 33 South , Range 39 East , Indian River County, Florida . <br /> Project Scope . <br /> The SURVEYOR shall provide Professional Land Surveying services to include the following : <br /> 1 ) Establish horizontal control network along +/- 13 , 200 feet within the ( Moderate Traffic — Residential Area ) <br /> Right-of-Way corridor with ties to existing Indian River County Horizontal Control Monument along or <br /> closely adjacent to the project corridor <br /> 2 ) Establish horizontal and baseline control of project to Florida State Plane Coordinate System , East Zone , <br /> NAD 83/07 . <br /> 3 ) Establish baseline and possible offset baseline of Right-of-Way. Set nail and disks ( or sufficient <br /> monumentation ) at all centerline points of intersection PC ' s , PI ' s , PT' s and at intervals not to exceed 1 , 000 <br /> feet . <br /> 4 ) Reference Baseline Points , with a minimum of 3 points ( preferably 4 points - 2 sets of <br /> 2 points ) set <br /> perpendicular to the baseline and outside of the existing Right-of-Way . <br /> 5 ) Establish and set vertical benchmarks along the topographic route right of way survey not to exceed 700 <br /> feet intervals . Benchmarks to be established to Indian River County Vertical Control Datum in NGVD 29 , <br /> with conversion stated to NAVD 88 . <br /> 6 ) Locate and / or establish block corners , lot corners , recover / re-survey section and 1 /4 section corners <br />, <br /> ties to government lot and section lines along and intersecting the right-of-way corridor. <br /> 7 ) Recover and verify any existing Right-of-Way Maps of the corridor. <br /> 8 ) Prepare Certified Corner Reports ( CCR ) or update on all found , used and or established sectional control <br /> throughout the project <br /> 9 ) Tie into and / re-establish alignment of existing control right-of-way maps at major roadway intersections . <br /> F : Tngineering\Tom Croon qu ist\Pri vate\B CC Agenda Items\2011 \1 1 -05 -05 8th Street 1049 - 58th Ave to 20th Ave - Route Survey - IRS\Consent <br /> Agenda Support Docs\ I 1 -05 -09 IRS Proposal . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.