My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-115
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:27:42 PM
Creation date
10/1/2015 2:38:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/17/2011
Control Number
2011-115
Agenda Item Number
8.E.
Entity Name
Indian River Survey Inc.
Subject
Route Survey
Area
8th St. (Glendale Road) from 58th Ave. to 20th Ave.
Project Number
1049
Supplemental fields
SmeadsoftID
9914
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 ) Indian River County to furnish boundary surveys , recorded plats , Right of Way Maps and/or relevant <br /> information helpful to the positioning of the project from Indian River County files . The SURVEYOR will <br /> research office archive survey records of relevant adjacent parcel boundary data . <br /> 11 ) The SURVEYOR will utilize the Indian River County property appraiser' s tax role website information for <br /> the approximate 80 +/- current property ownerships , deed descriptions and possible associated <br /> documents . Indian River County will provide owner/encumbrance and title search report if or when <br /> necessary , or requested of any adjacent parcel bordering and/or within the established limits along the <br /> corridor <br /> 12 ) The Right-of-Way mapping project. shall be prepared in a fashion as to model State of Florida Department <br /> of Transportation Right of Way Mapping and meet the Indian River County Right of Way check <br /> list <br /> requirements and guide requirements in scope of task exhibit furnished by Indian River County Surveyor <br /> Thomas J . Croonquist. Final plans may be used by the consultant or 3`d parties as base map <br /> for any <br /> additional Topographic Surveys as determined by the Indian River County via separate work order <br /> 13 ) Field observe and record vertical ground elevations cross sections 25 ' outside of right way at 100 ' intervals <br /> and all specific points ( inverts , bottom of structures , retention areas , etc . ) and changes in contour within the <br /> right of way corridor. <br /> • Cross sections to be performed at 100 ' even baseline stations . <br /> • All pipes and headwalls are to be indentified by size and materials and clearly state pipe inverts . <br /> • All Lateral Canals and Ditches , along with cross drains , shall be located and mapped , identifying <br /> all pipes by size and materials and clearly state pipe inverts . <br /> 14 ) Field observe and record vertical ground elevations cross sections 100 ' each way on side streets @ 50 ' <br /> intervals and all specific points and changes in contour within the right of way of side streets . <br /> 15 ) Field locate and record existing building structures footprint ( roadway face only) , all man -made <br /> above <br /> ground and natural features ( over head electrical , valves , retention ponds , signs , culverts , road and etc . <br />) <br /> within right of way corridor and 25 ' outside of right-of-way. <br /> 16 ) The SURVEYOR will meet and correspond with Indian River County surveying division staff to review and <br /> discuss project progress and data . <br /> 17 ) The Topographic Route Right-of-Way Survey shall be prepared in a fashion as to be easily used by the <br /> consultant or Td parties as base map for any additional Topographic Surveys as determined by the Indian <br /> River County via separate work order. <br /> Project is to adhere to provided Indian River County Right-of-Way Map Checklist. <br /> Project Schedule . <br /> Time of 30 % - 60 % - 90% phase submittals from notice to proceed . <br /> 30 % Submittal shall be made at 60 days after receipt of Notice to Proceed . <br /> 60 % Submittal shall be made at 60 days after receiving comments back from county of the 30 % Submittal . <br /> 90 % Submittal shall be made at 60 days after receiving comments back from county of the 60 % Submittal . <br /> 100 % " Paper ' Submittal shall be made prior to the Final Deliverables for the project to ensure all <br /> previous <br /> comments have been addressed . <br /> F : Tngineering\Tom Croonquist\Private\BCC Agenda Items\2011 \ 1 1 -05 -05 8th Street 1049 - 58th Ave to 20th Ave - Route Survey - IRS\Consent <br /> Agenda Support Docs\ l 1 -05 - 09 IRS Proposal . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.