My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-139
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2015 1:02:49 PM
Creation date
10/1/2015 4:34:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/17/2012
Control Number
2012-139
Agenda Item Number
12.J.3
Entity Name
Kimley-Horn and Associates
Subject
Work Order No. 3
Finish Water Stablization Implemention
Area
Water Treatment Facilities
Supplemental fields
SmeadsoftID
11331
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1 . 2 — Conduct Pilot Testing <br /> It is assumed that one fabricated pilot unit will be installed at the South WTP and the Cal�Flo <br /> unit will be operated and tested at both the North and South WTP ' s . It is assumed that the results <br /> of the testing by the Burnett Lime Company for both plants and the results from the fabricated <br /> pilot unit at the South WTP can be used to extrapolate the lime and CO2 feed rates for the North <br /> Hobart WTP . Consultant will coordinate siting, piping, and electrical needs for the trailer <br /> mounted Cal�Flo unit at both facilities . <br /> Consultant will provide on- site testing of fabricated pilot unit and provide observations of <br /> Cal�Flo operation and testing, which will be conducted by Cal�Flo/Burnett Lime Company <br /> representatives . Consultant will conduct testing of fabricated pilot unit water, and adjust feed <br /> rates of unit in order to achieve the finish water quality goals outlined in the Stabilization Study . <br /> Consultant will utilize IRCU ' s South WTP lab testing equipment for testing of, <br /> • Hardness (Ca and total ) <br /> • Alkalinity (total) <br /> • pH <br /> • Turbidity <br /> • TDS <br /> • Temperature <br /> It is assumed that up to two weeks of testing will be conducted once the pilot unit is ready for <br /> testing. Consultant will provide up to 5 days of on- site presence during pilot unit operation and <br /> conduct testing and adjust pilot unit settings during this phase . The pilot unit operation will not <br /> be run continuously . Operation and testing will be conducted only during scheduled times . <br /> Consultant will collect data for the pilot units and summarize the field data. <br /> Task 1 . 3 — Summarize Results and Prepare Report <br /> Consultant will summarize results in tabular form and prepare a letter report outlining the results <br /> of the pilot testing. A letter report of our findings will be prepared and is assumed that it will be <br /> five to seven pages in length . Graphs used to illustrate findings will be prepared if deemed <br /> necessary . <br /> Consultant will prepare a draft report for IRCU staff review and attend one meeting, if necessary <br /> to discuss findings . Consultant will finalize report and submit up to four copies of letter report . <br /> TASK 2 - DESIGN & PREPARATION OF DRAWINGS AND SPECIFICATIONS <br /> Task 2 . 1 - Design <br /> Consultant will design a lime feed (Ca(OH)2) and storage system, carbon dioxide feed and liquid <br /> storage tank, and a make- up water system for the CO2 feed system , for stabilization of the finish <br /> water of both the South Oslo Road and the North Hobart water treatment plants . The general <br /> design will be similar in terms of process for both facilities . The general operation for both <br /> K : AWPB Civil\044572022 - IRCU Stabilization\ScopeAFinish Water Stabilization Scope - IRCU, final . docx Page 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.