2012-139
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2015 1:02:49 PM
Creation date
10/1/2015 4:34:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/17/2012
Control Number
2012-139
Agenda Item Number
12.J.3
Entity Name
Kimley-Horn and Associates
Subject
Work Order No. 3
Finish Water Stablization Implemention
Area
Water Treatment Facilities
Supplemental fields
SmeadsoftID
11331
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
systems will be identical and similar in nature in order to standardize operations . The system will <br /> generally consist of lime slurry and CO2 storage tank(s), feed systems for both , make-up water for <br /> the CO2 feed system , and modifications to the existing clearwell to improve mixing of the <br /> CO2/Lime feed streams to the degasified blended permeate stream . <br /> Consultant will size the storage tanks for lime and CO2, size the lime feed pumps and CO2 feed <br /> system , and will select pumps for the lime feed system and make- up water ( if necessary ) for the <br /> CO2 feed system at both facilities . <br /> Consultant will evaluate the impacts on the CT calculations which were prepared for each water <br /> plant and update the calculations for each facility . Consultant will provide updated CT <br /> calculations for Owners use and if necessary , submittal to FDEP. <br /> Consultant will coordinate and attend up to two (2 ) site visits with IRCU plant operations staff to <br /> other lime feed and CO2 feed systems currently in operation or being installed at other water <br /> treatment facilities in South Florida. <br /> Consultant will design interior modifications to the clearwell which will be necessary for the <br /> enhancement mixing of lime and CO2 . It is assumed that each clearwell bay (2 — South Oslo <br /> Road plant, 4 — North Hobart plant) will house a mixing chamber and/or device . <br /> Consultant will evaluate procurement methods for purchase of Cal �Flo due to its proprietary <br /> status and evaluate options for purchase of CO2 from multiple vendors . <br /> Consultant will provide structural calculations and design of the lime slurry and liquid CO2 tank <br /> slabs in accordance with the new Florida Building Code adopted March 15 , 2012 . <br /> Consultant will design a make- up water supply for the CO2 feed system which may require more <br /> than 100 gpm of supply water, consisting of two options : finish water supply from the <br /> distribution system , or booster pumps which draw water from the clearwell . <br /> Consultant will prepare an operating philosophy for the operation , control , and monitoring of the <br /> feed systems . Operating logic will be included in the technical specifications used in bidding the <br /> project . <br /> Consultant will provide electrical engineering services to serve the proposed chemical feed and <br /> storage systems , PLC systems , and instrumentation and control system . The design will consist <br /> of power distribution , electrical load calculations, site lighting, conduit and wire design , and <br /> panel design . The electrical engineering scope will consist of coordination , meetings, field <br /> investigation, drawing production, schematics , panel schedules , technical specifications , and <br /> opinions of probable construction costs . <br /> The Consultant will submit an updated opinion of probable construction cost for the project, <br /> based on 90% submittal and after final documents are prepared . <br /> Task 2 . 2 — Prepare Drawings and Specifications <br /> The Consultant will prepare design drawings of the proposed improvements at both water plant <br /> sites , consisting of the following sheets : <br /> KAWPB Civil\044572022 - IRCU stabilization\Scope\Finish Water Stabilization Scope - IRCU, tlnal . doex Page 3 of 7 <br />