My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-139
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2015 1:02:49 PM
Creation date
10/1/2015 4:34:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/17/2012
Control Number
2012-139
Agenda Item Number
12.J.3
Entity Name
Kimley-Horn and Associates
Subject
Work Order No. 3
Finish Water Stablization Implemention
Area
Water Treatment Facilities
Supplemental fields
SmeadsoftID
11331
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Cover with site location map, one ( 1 ) sheet <br /> • Site plans (2) <br /> • Equipment and piping plans (2) <br /> • Clearwell plan and details (2) <br /> • Mechanical details (24) <br /> • PID ' s (2) <br /> • Electrical — power, I&C, lighting (6- 10) <br /> • Detail sheets and IRCU standard details (2- 3 ) <br /> Preparation of final construction drawings will consist of 24" x 36" and 11 " x17 " drawing sizes in <br /> electronic format in AutoCADD 2011 version in real world coordinates . Detailed drawings of <br /> specific construction items that may be required for this project will be provided . IRCU Standard <br /> detail sheets will consist of up to three sheets . <br /> It is assumed that Auto CAD base file of the North Hobart plant can be furnished from IRCU and <br /> that existing information of the site does not need to be re- created . <br /> Consultant will prepare 90% drawings and submit up to six (6) sets for review by Owner. <br /> Consultant will attend a review meeting to discuss owners ' comments and incorporate owners ' <br /> comments into a final set of drawings . <br /> Consultant will attend the following meetings to discuss the objectives and progress of the project <br /> and design requirements specific to this project : <br /> • Kick- off meeting <br /> • Progress meeting at 90% completion <br /> Consultant will prepare technical specifications for the project <br /> Task 3 — PERMITTING <br /> Consultant will prepare and submit two (2) FDEP permit applications , FDEP form 62 - 555 . 900( 1 ) <br /> for the proposed water treatment plant modifications . The FDEP application fee for one water <br /> plant at the time of this writing is $ 12 , 500 , of which is not included in this scope . Consultant will <br /> prepare drawings and specifications , the application, and supporting information for permitting <br /> agency review . Consultant will respond to up to two requests for additional information ( RFI ' s) <br /> from FDEP . Responses to unreasonable RFI ' s are not included . <br /> A preliminary design report consisting of the pilot test results and preliminary design information <br /> will be included with the FDEP submittal package . <br /> It is assumed that minor and major site plan approvals are not necessary for the improvements at <br /> each water plant site since the improvements will be less than 1 , 500 sq ft, and that only a <br /> technical review committee (TRC) review will be necessary . Consultant will prepare documents <br /> and submit to the TRC and attend one meeting with TRC to answer questions and receive <br /> confirmation that a site plan approval (minor or major) will not be necessary . <br /> K :\WPB—Civil\044572022 - IRCU Stab ilization\Scope\Finish Water Stabilization Scope - IRCU, final . docx Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.