Laserfiche WebLink
Task No. Task Task Fee <br /> TASK 1 PILOT TESTING <br /> Task 1 . 1 Coordination $ 129500 <br /> Task 1 .2 Conduct Pilot Testing $ 119500 <br /> Task 1 .3 Summarize Results and Prepare Report $ 69100 <br /> TASK 2 DESIGN — DRAWINGS AND SPECS <br /> Task 2 . 1 Design $ 33 ,000 <br /> Task 2 .2 Prepare dw s andspecs $ 63 ,000 <br /> TASK 3 PERMITTING $ 95500 <br /> TASK 4 CONSTRUCTION $589000 <br /> TOTAL $ 1939600 <br /> ADDITIONAL SERVICES <br /> The following services are not included in the Scope of Services for this project, but may be <br /> required depending on circumstances that may arise during the execution of this project . <br /> Additional services include , but may not be limited to the following : <br /> • Fabrication of the pilot unit <br /> • Pilot testing at the North Hobart Plant beyond what will be performed with the Cal�Flow <br /> pilot unit <br /> • Any impacts or modifications to facilities as a result of revised CT calculations beyond <br /> those listed in this scope are considered additional services . <br /> • It is assumed that existing geotechnical data and information from the existing facility is <br /> adequate and no other borings or geotechnical testing will be necessary . <br /> • FDEP permit application fee <br /> • TRC site plan approval fees <br /> K :AWPB Civil\044572022 - IRCU Stabilization\ScopeAFinish Water Stabilization Scope - IRCU, final . docx Page 7 of <br />