Laserfiche WebLink
Attachment #1 <br />Work Order Number 19 <br />Demonstration of 4 -log Virus Treatment of Ground Water Rule <br />North and South RO Water Treatment Plants <br />Project Understanding <br />In response to the US EPA Federal Groundwater Rule, Florida's public water systems (PWS) that <br />use groundwater will have to comply with the new rule effective December 1, 2009. Although <br />the USEPA approved groundwater rule has not been incorporated into the Florida Administrative <br />Code and is not expected to be approved until late 2010, any Florida PWS must still comply with <br />the Rule. The intent of this rule is to increase protection against microbial pathogens in PWS's, <br />which essentially requires additional microbial monitoring for all PWS's. If 4 -log (99.99%) virus <br />treatment can be demonstrated by each of the treatment facilities, source water and finished water <br />"triggered" and "assessment" microbial monitoring will not be necessary, which will reduce the <br />amount and frequency of bacteriological testing. Achieving 4 -log removal requires written <br />approval by FDEP. <br />Indian River County Utilities staff has requested Kimley-Horn and Associates, Inc. prepare and <br />submit a demonstration of 4 -log removal/inactivation of viruses summary for both regional water <br />treatment facilities, the North Hobart and South Oslo Road membrane water treatment facilities. <br />The intent is to receive written approval by FDEP of four -log virus treatment for both facilities <br />under the current Guidelines for Four -Log Virus Treatment Treatment of Ground Water, <br />Drinking Water Section, Florida Department of Environmental Protection, October 2009. <br />SCOPE OF SERVICES <br />The Scope of Services for Work Order #19 consists of the following: <br />Task 1 — Prepare Water Plant Schematics <br />Consultant will prepare a water plant schematic of the water plant components which are relative <br />to demonstrating 4 -log removal/inactivation, consisting of treatment components, chlorine <br />injection points, monitoring locations, clearwell, ground storage tank, high service pumps, etc. <br />Consultant will prepare schematics for both the Hobart (North) and Oslo (South) water treatment <br />plants. <br />Owner will furnish electronic version of the Hobart water plant schematic for use in preparation <br />of submittal to FDEP. Consultant will submit water plant schematics to FDEP as part of the <br />information in demonstrating 4 -log virus treatment. <br />Task 2 — Review Historical Data of Water Plants <br />Consultant will review historical water plant operating data which can be used to calculate the <br />appropriate "CT" (chlorine residual � C and contact time �T). The parameters needed to <br />calculate CT consist of pH, temperature, chlorine residual, and volumes of tanks/clearwell/piping. <br />K:AWPB Civil\Genera]\Miller\Indian River County\IRCU GWR Evaluation.docx Page I of 3 <br />