My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-162
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2016 1:48:38 PM
Creation date
10/1/2015 4:40:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/18/2012
Control Number
2012-162
Agenda Item Number
12.J.3.
Entity Name
Kimley Horn and Associates, Inc.
Subject
Work Order No.4 Stormwater Supply to Algal Turf Scrubber
Area
5th Street SW South RO Plant Concentrate Disposal
Project Number
0391
Supplemental fields
SmeadsoftID
11431
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit # 1 <br /> Work Order Number 4 <br /> Stormwater Supply to Algal Turf Scrubber System at <br /> 5th Street SW Site <br /> South RO Plant Concentrate Disposal <br /> PROJECT DESCRIPTION <br /> This work order 94 includes additional survey , pot- holing , design , site planning support, <br /> permitting and construction phase services to account for a change in the proposed pipeline <br /> route and relocated Algal Turf Scrubber (ATS ) site to east of the Oslo Road water <br /> treatment plant, beyond what was included in the original Work Order #2 . In summary , <br /> the additional scope of work in general , consists of. <br /> Pump Station Site and 27th Avenue Bridge <br /> The pump station will be located west of the 27th Avenue bridge over the South Relief <br /> Canal and require additional survey and design to cross the canal and extend up to 100 ft <br /> west of the bridge . This work order includes the additional services required to extend the <br /> stormwater pipe to the selected location . It is anticipated that the stormwater pipe will be <br /> installed as aerial attached to the existing bridge crossing the South Relief Canal . <br /> • Provide additional survey , pot-holing , and design of pipe over the bridge and into <br /> the pump station site . <br /> • A specific purpose survey and document will be prepared for the pump station site , <br /> which will consist of locating encroachments , and topographical information at the <br /> pump station location . <br /> 27th Avenue Road Crossin ;? (EnOneering IRC Proiect #0391 ) <br /> The Indian River County Roadway Division ( IRCRD ) is planning a widening project for a <br /> portion of 27th Avenue and 5t" Street between July 2012 and January 2013 . In order to <br /> prevent potential damage to this new widened section from the proposed ATS pipeline <br /> construction , a phasing plan must be prepared for the construction of a portion of the ATS <br /> pipeline within this project . <br /> • Consultant will prepare the phasing plan and provide additional coordination with <br /> IRCRD during construction phase of this work. <br /> Environmental Resource Permitting <br /> The County is preparing an Environmental Resource Permit ( ERP) application to submit to <br /> the Florida Department of Environmental Protection ( FDEP) for the proposed stormwater <br /> pump station , ATS site and , and ATS stormwater pipe . It is our understanding that <br /> K : AWP [3_Civi1\044572021 - ATS Stormwater Pipe\ ScopeAATS Pipeline Project - Work Order 4 REV I . doc <br /> Page I ol' 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.