Laserfiche WebLink
Exhibit # 1 <br /> Work Order Number 4 <br /> Stormwater Supply to Algal Turf Scrubber System at <br /> 5th Street SW Site <br /> South RO Plant Concentrate Disposal <br /> PROJECT DESCRIPTION <br /> This work order 94 includes additional survey , pot- holing , design , site planning support, <br /> permitting and construction phase services to account for a change in the proposed pipeline <br /> route and relocated Algal Turf Scrubber (ATS ) site to east of the Oslo Road water <br /> treatment plant, beyond what was included in the original Work Order #2 . In summary , <br /> the additional scope of work in general , consists of. <br /> Pump Station Site and 27th Avenue Bridge <br /> The pump station will be located west of the 27th Avenue bridge over the South Relief <br /> Canal and require additional survey and design to cross the canal and extend up to 100 ft <br /> west of the bridge . This work order includes the additional services required to extend the <br /> stormwater pipe to the selected location . It is anticipated that the stormwater pipe will be <br /> installed as aerial attached to the existing bridge crossing the South Relief Canal . <br /> • Provide additional survey , pot-holing , and design of pipe over the bridge and into <br /> the pump station site . <br /> • A specific purpose survey and document will be prepared for the pump station site , <br /> which will consist of locating encroachments , and topographical information at the <br /> pump station location . <br /> 27th Avenue Road Crossin ;? (EnOneering IRC Proiect #0391 ) <br /> The Indian River County Roadway Division ( IRCRD ) is planning a widening project for a <br /> portion of 27th Avenue and 5t" Street between July 2012 and January 2013 . In order to <br /> prevent potential damage to this new widened section from the proposed ATS pipeline <br /> construction , a phasing plan must be prepared for the construction of a portion of the ATS <br /> pipeline within this project . <br /> • Consultant will prepare the phasing plan and provide additional coordination with <br /> IRCRD during construction phase of this work. <br /> Environmental Resource Permitting <br /> The County is preparing an Environmental Resource Permit ( ERP) application to submit to <br /> the Florida Department of Environmental Protection ( FDEP) for the proposed stormwater <br /> pump station , ATS site and , and ATS stormwater pipe . It is our understanding that <br /> K : AWP [3_Civi1\044572021 - ATS Stormwater Pipe\ ScopeAATS Pipeline Project - Work Order 4 REV I . doc <br /> Page I ol' 9 <br />