Laserfiche WebLink
Kimley - Horn is only responsible for permit documents related to the stormwater pipe and <br /> that others will be responsible for the preparation of the ERP application and all supporting <br /> documents related to the ATS site and pump station . <br /> • This work order includes additional permitting services to prepare documents for <br /> the ATS stormwater pipe that can be included in the County ' s ERP application to <br /> FDEP . <br /> ATS Site Support <br /> • Provide support in preparing a " submittable" site plan based on survey and design <br /> layout provided by IRC and include water treatment plant property . <br /> • Prepare landscape plan and perimeter sections . <br /> Prepare Clearing Plan and address status of native and protected trees . <br /> • Paving , Grading and Drainage plan for site driveway connection to 5th St SW and <br /> internal roadways . IRC to prepare ATS site specific paving , grading , drainage <br /> plan . <br /> • Prepare survey of sub- lateral E- 7 canal for drainage and peak stage analysis , <br /> conduct drainage calculations of canal capacity and coordination with Indian River <br /> Farms Water Control District ( IRFWCD) . <br /> • Prepare and design ATS outfall and improvements to sub - lateral E- 7 canal outfall <br /> structure into Lateral J canal . <br /> • Prepare utility plan of water treatment site , consisting of concentrate line , security , <br /> fencing , and access . <br /> • Technical Review Committee , Planning and Zoning , and Board of County <br /> Commissioners meeting attendance and preparation . <br /> The following scope of work under this work order consists of. <br /> SCOPE OF SERVICES <br /> Task 1 — SURVEY AND UTILITY LOCATES <br /> The South Relief Canal pump station is to be located in the South Relief Canal ' s north <br /> right- of- way approximately I OM west of 27th Avenue ' s west right of way . Topographic <br /> Route Survey will be performed to extend the limits of the survey included in Work Order <br /> # 2 to include the proposed pump station . The limits of the survey will be 50M west of <br /> the 27th Avenue ' s west right- of-way , 27th Avenue ' s east right- of-way , 25 - ft north of the <br /> north canal right-of- way , and 25 -ft south of the south canal top- of-bank . The topographic <br /> survey will include canal cross - sections every 50 ' beginning at the 27th Avenue western <br /> right-of- way , I - ft contours for the entire surveyed area, and observed physical features . <br /> Additional Topographic Route Survey will also be performed along sub- lateral E - 7 canal <br /> from station 254 + 50 to 288 + 75 ( Lateral J canal ) . Canal cross sections at 100 ft intervals <br /> along the route , including outfalls into the canal , or approximately 34 cross section <br /> locations . <br /> K :AW PB_Civil\044572021 - A FS Stormwater Pipe\Scope\ATS Pipeline Project - Work Order 4 REV I . doc <br /> Page 2 of9 <br />