My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-162
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2016 1:48:38 PM
Creation date
10/1/2015 4:40:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/18/2012
Control Number
2012-162
Agenda Item Number
12.J.3.
Entity Name
Kimley Horn and Associates, Inc.
Subject
Work Order No.4 Stormwater Supply to Algal Turf Scrubber
Area
5th Street SW South RO Plant Concentrate Disposal
Project Number
0391
Supplemental fields
SmeadsoftID
11431
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley - Horn is only responsible for permit documents related to the stormwater pipe and <br /> that others will be responsible for the preparation of the ERP application and all supporting <br /> documents related to the ATS site and pump station . <br /> • This work order includes additional permitting services to prepare documents for <br /> the ATS stormwater pipe that can be included in the County ' s ERP application to <br /> FDEP . <br /> ATS Site Support <br /> • Provide support in preparing a " submittable" site plan based on survey and design <br /> layout provided by IRC and include water treatment plant property . <br /> • Prepare landscape plan and perimeter sections . <br /> Prepare Clearing Plan and address status of native and protected trees . <br /> • Paving , Grading and Drainage plan for site driveway connection to 5th St SW and <br /> internal roadways . IRC to prepare ATS site specific paving , grading , drainage <br /> plan . <br /> • Prepare survey of sub- lateral E- 7 canal for drainage and peak stage analysis , <br /> conduct drainage calculations of canal capacity and coordination with Indian River <br /> Farms Water Control District ( IRFWCD) . <br /> • Prepare and design ATS outfall and improvements to sub - lateral E- 7 canal outfall <br /> structure into Lateral J canal . <br /> • Prepare utility plan of water treatment site , consisting of concentrate line , security , <br /> fencing , and access . <br /> • Technical Review Committee , Planning and Zoning , and Board of County <br /> Commissioners meeting attendance and preparation . <br /> The following scope of work under this work order consists of. <br /> SCOPE OF SERVICES <br /> Task 1 — SURVEY AND UTILITY LOCATES <br /> The South Relief Canal pump station is to be located in the South Relief Canal ' s north <br /> right- of- way approximately I OM west of 27th Avenue ' s west right of way . Topographic <br /> Route Survey will be performed to extend the limits of the survey included in Work Order <br /> # 2 to include the proposed pump station . The limits of the survey will be 50M west of <br /> the 27th Avenue ' s west right- of-way , 27th Avenue ' s east right- of-way , 25 - ft north of the <br /> north canal right-of- way , and 25 -ft south of the south canal top- of-bank . The topographic <br /> survey will include canal cross - sections every 50 ' beginning at the 27th Avenue western <br /> right-of- way , I - ft contours for the entire surveyed area, and observed physical features . <br /> Additional Topographic Route Survey will also be performed along sub- lateral E - 7 canal <br /> from station 254 + 50 to 288 + 75 ( Lateral J canal ) . Canal cross sections at 100 ft intervals <br /> along the route , including outfalls into the canal , or approximately 34 cross section <br /> locations . <br /> K :AW PB_Civil\044572021 - A FS Stormwater Pipe\Scope\ATS Pipeline Project - Work Order 4 REV I . doc <br /> Page 2 of9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.