Laserfiche WebLink
Additional topographic and location survey at the water plant area west of the new ATS <br /> site survey with the limits being 100 tt west of the eastern property boundary , the north jog <br /> in the fence line , then south to 100 ft south of the driveway into the parking lot . <br /> Vertical underground locates of known existing utilities will be required at areas where <br /> potential conflicts exist and at tie - in locations . This information is necessary to collect <br /> location , depth , and pipe size/material that will be required for the design . It is expected <br /> that approximately three (3 ) holes in the South Relief Canal /271h Avenue right- of-- ways and <br /> drainage easement will be performed for the pipe extensions . <br /> Task 2 - DESIGN <br /> 27th Ave Bridge <br /> The Consultant will perform structural calculations to design the connections to the <br /> existing 27th Avenue Bridge over the South Relief Canal . The design of the bridge will <br /> also incorporate relocating the forcemain that is currently attached to the west side of the <br /> bridge . Since the FM is less than I OM in length , it is assumed that a FDEP permit will <br /> not be required . <br /> It is understood that the stormwater pump station will be designed by others and that the <br /> Consultant will be provided with information regarding the tie - in locations to the <br /> stormwater pipe route . <br /> ATS Site <br /> The Consultant will prepare design drawings of the stormwater piping to extend it to the <br /> property line of the ATS site on the east end . Existing utility information provided by <br /> IRCU and others will be used in conjunction with the survey and underground locate <br /> information as a basis for design of the piping alignment . The design drawings will be <br /> incorporated into the design drawings that are being prepared as part of Work Order #2 . <br /> Technical specifications will be prepared as described in Work Order #2 . <br /> It is anticipated that the following drawings will be updated to include the additional <br /> stormwater pipe . <br /> • Update one ( 1 ) horizontal plan views of alignment to include pipe extension to the <br /> proposed pump station . <br /> • Plan and profiles for canal crossing , one ( 1 ) sheet <br /> • Construction details for connections to the bridge <br /> 27th Avenue Road Crossing Coordination with Public Works <br /> Consultant will prepare a separate set of construction drawings for the 27th Avenue <br /> crossing . It is anticipated that this set will contain a cover sheet, a plan sheet of the <br /> crossing, and construction details . All notes and specifications will be included on the <br /> construction drawings as a separate set of technical specifications will not be prepared . <br /> K :AWPE3_Civil\044572021 - Arf'S Stormwater Pipe\Scope\A "hS Pipeline Project - Work Order 4 REV f . doc <br /> Page 3 of' 9 <br />