My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-162
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2016 1:48:38 PM
Creation date
10/1/2015 4:40:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/18/2012
Control Number
2012-162
Agenda Item Number
12.J.3.
Entity Name
Kimley Horn and Associates, Inc.
Subject
Work Order No.4 Stormwater Supply to Algal Turf Scrubber
Area
5th Street SW South RO Plant Concentrate Disposal
Project Number
0391
Supplemental fields
SmeadsoftID
11431
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional topographic and location survey at the water plant area west of the new ATS <br /> site survey with the limits being 100 tt west of the eastern property boundary , the north jog <br /> in the fence line , then south to 100 ft south of the driveway into the parking lot . <br /> Vertical underground locates of known existing utilities will be required at areas where <br /> potential conflicts exist and at tie - in locations . This information is necessary to collect <br /> location , depth , and pipe size/material that will be required for the design . It is expected <br /> that approximately three (3 ) holes in the South Relief Canal /271h Avenue right- of-- ways and <br /> drainage easement will be performed for the pipe extensions . <br /> Task 2 - DESIGN <br /> 27th Ave Bridge <br /> The Consultant will perform structural calculations to design the connections to the <br /> existing 27th Avenue Bridge over the South Relief Canal . The design of the bridge will <br /> also incorporate relocating the forcemain that is currently attached to the west side of the <br /> bridge . Since the FM is less than I OM in length , it is assumed that a FDEP permit will <br /> not be required . <br /> It is understood that the stormwater pump station will be designed by others and that the <br /> Consultant will be provided with information regarding the tie - in locations to the <br /> stormwater pipe route . <br /> ATS Site <br /> The Consultant will prepare design drawings of the stormwater piping to extend it to the <br /> property line of the ATS site on the east end . Existing utility information provided by <br /> IRCU and others will be used in conjunction with the survey and underground locate <br /> information as a basis for design of the piping alignment . The design drawings will be <br /> incorporated into the design drawings that are being prepared as part of Work Order #2 . <br /> Technical specifications will be prepared as described in Work Order #2 . <br /> It is anticipated that the following drawings will be updated to include the additional <br /> stormwater pipe . <br /> • Update one ( 1 ) horizontal plan views of alignment to include pipe extension to the <br /> proposed pump station . <br /> • Plan and profiles for canal crossing , one ( 1 ) sheet <br /> • Construction details for connections to the bridge <br /> 27th Avenue Road Crossing Coordination with Public Works <br /> Consultant will prepare a separate set of construction drawings for the 27th Avenue <br /> crossing . It is anticipated that this set will contain a cover sheet, a plan sheet of the <br /> crossing, and construction details . All notes and specifications will be included on the <br /> construction drawings as a separate set of technical specifications will not be prepared . <br /> K :AWPE3_Civil\044572021 - Arf'S Stormwater Pipe\Scope\A "hS Pipeline Project - Work Order 4 REV f . doc <br /> Page 3 of' 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.