My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-162
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2016 1:48:38 PM
Creation date
10/1/2015 4:40:32 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/18/2012
Control Number
2012-162
Agenda Item Number
12.J.3.
Entity Name
Kimley Horn and Associates, Inc.
Subject
Work Order No.4 Stormwater Supply to Algal Turf Scrubber
Area
5th Street SW South RO Plant Concentrate Disposal
Project Number
0391
Supplemental fields
SmeadsoftID
11431
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Calculate the hydraulic capacity of the Lateral E - 7 canal between the proposed <br /> ATS site and the Lateral J canal based on survey information and available peak <br /> stage information for the Lateral E- 7 and Lateral J canals . <br /> • Compare the design capacity of the E- 7 canal with the hydraulic capacity of the <br /> canal to determine if there if there is sufficient capacity in the Lateral E - 7 to handle <br /> the maximum design flow from the ATS site . <br /> • Perform headloss calculations between the proposed ATS site and the Lateral E- 7 <br /> canal to quantify how much the hydraulic grade line will increase with the addition <br /> of flows from the ATS site . <br /> Consultant will perform calculations for and design a velocity dissipater for the area where <br /> the Lateral E- 7 canal discharges into the Lateral J canal . It is anticipated that the velocity <br /> dissipater will consist of a section of rip rap that will be sized to reduce the scouring in the <br /> Lateral J canal . A plan sheet with notes and details will be added to the construction <br /> documents being prepared for ATS Stormwater FM project . <br /> Consultant will design a control structure from the proposed ATS site to the Lateral E- 7 <br /> canal for the ATS effluent discharge . The control structure will be added to the <br /> construction documents being prepared as part of the ATS Stormwater FM project and a <br /> new construction detail sheet will be prepared . <br /> Consultant will attend regularly scheduled bi - monthly progress meetings until January <br /> 2013 . <br /> ADDITIONAL SERVICES <br /> The following services are not included in the Scope of Services for this project , but may <br /> be required depending on circumstances that may arise during the execution of this project . <br /> Other items that may be considered additional services are mentioned herein . Additional <br /> services include , but may not be limited to the following : <br /> • Construction phase services beyond what is described in the Scope of Services . <br /> • Traffic studies <br /> • Building department coordination and structural design <br /> • Environmental studies , including scrub jay and gopher tortoise surveys , wetland <br /> delineation , and protected species determination <br /> • All coordination with FDEP including application submittals will be handled by <br /> others . <br /> INFORMATION AND SERVICES PROVIDED BY OWNER <br /> The Owner shall provide the following information related to the design of this <br /> construction project : <br /> • Stormwater pump station design , including site and mechanical by IRC public <br /> works <br /> • Boundary survey , base survey , tree survey , and topographical information of new <br /> ATS site by IRCU ( Masteller, Moller, and Reed) <br /> • Record drawings of water and sewer utilities along the determined route <br /> K : AWPB Civil\044572021 - ATS Stormwater Pipc\Scope\ATS Pipeline Project - Work Order 4 RLV I . doc <br /> Page 6 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.