Laserfiche WebLink
• Calculate the hydraulic capacity of the Lateral E - 7 canal between the proposed <br /> ATS site and the Lateral J canal based on survey information and available peak <br /> stage information for the Lateral E- 7 and Lateral J canals . <br /> • Compare the design capacity of the E- 7 canal with the hydraulic capacity of the <br /> canal to determine if there if there is sufficient capacity in the Lateral E - 7 to handle <br /> the maximum design flow from the ATS site . <br /> • Perform headloss calculations between the proposed ATS site and the Lateral E- 7 <br /> canal to quantify how much the hydraulic grade line will increase with the addition <br /> of flows from the ATS site . <br /> Consultant will perform calculations for and design a velocity dissipater for the area where <br /> the Lateral E- 7 canal discharges into the Lateral J canal . It is anticipated that the velocity <br /> dissipater will consist of a section of rip rap that will be sized to reduce the scouring in the <br /> Lateral J canal . A plan sheet with notes and details will be added to the construction <br /> documents being prepared for ATS Stormwater FM project . <br /> Consultant will design a control structure from the proposed ATS site to the Lateral E- 7 <br /> canal for the ATS effluent discharge . The control structure will be added to the <br /> construction documents being prepared as part of the ATS Stormwater FM project and a <br /> new construction detail sheet will be prepared . <br /> Consultant will attend regularly scheduled bi - monthly progress meetings until January <br /> 2013 . <br /> ADDITIONAL SERVICES <br /> The following services are not included in the Scope of Services for this project , but may <br /> be required depending on circumstances that may arise during the execution of this project . <br /> Other items that may be considered additional services are mentioned herein . Additional <br /> services include , but may not be limited to the following : <br /> • Construction phase services beyond what is described in the Scope of Services . <br /> • Traffic studies <br /> • Building department coordination and structural design <br /> • Environmental studies , including scrub jay and gopher tortoise surveys , wetland <br /> delineation , and protected species determination <br /> • All coordination with FDEP including application submittals will be handled by <br /> others . <br /> INFORMATION AND SERVICES PROVIDED BY OWNER <br /> The Owner shall provide the following information related to the design of this <br /> construction project : <br /> • Stormwater pump station design , including site and mechanical by IRC public <br /> works <br /> • Boundary survey , base survey , tree survey , and topographical information of new <br /> ATS site by IRCU ( Masteller, Moller, and Reed) <br /> • Record drawings of water and sewer utilities along the determined route <br /> K : AWPB Civil\044572021 - ATS Stormwater Pipc\Scope\ATS Pipeline Project - Work Order 4 RLV I . doc <br /> Page 6 of 9 <br />