Laserfiche WebLink
provide the Client a greater degree of confidence that the completed work of its contractors <br /> will generally conform to the construction documents prepared by the Consultant. The <br /> Consultant neither guarantees the performance of contractors , nor assumes responsibility <br /> for any contractor ' s failure to perform its work in accordance with the contract documents . <br /> Work that the Consultant believes does not comply with the contract documents will be <br /> brought to the attention of Indian River County Utilities and the contractor. The <br /> Consultant shall have no responsibility for any contractor' s means , methods , techniques , <br /> equipment choice and usage , sequence , schedule , safety programs , or safety practices , nor <br /> shall the Consultant have any authority or responsibility to stop or direct the work of any <br /> contractor. <br /> Record drawings will be prepared for the 27t" Street crossing in accordance with Work <br /> Order #2 . <br /> Task 5 — ATS SITE PLANNING <br /> Consultant will provide support in preparing a " submittable " site plan in accordance with <br /> the IRC site plan submittal standards based on survey and design layout furnished by IRC , <br /> and will show the water treatment plant property . Consultant will prepare landscape plan <br /> and perimeter sections ; a clearing plan which will address status of native and protected <br /> trees ; and paving , grading and drainage plan for the site driveway through the water plant <br /> site to the ATS site and connection to 5t St SW and internal roadways . Is it understood <br /> that IRC will prepare the ATS site specific paving, grading , drainage plan within the ATS <br /> site . <br /> Consultant will prepare and design ATS outfall and improvements to sub - lateral E- 7 canal <br /> outfall structure into lateral E canal . Consultant will meet and coordinate design criteria <br /> with IRFWCD . <br /> Consultant will prepare utility plan of water treatment site , consisting of concentrate line , <br /> security , fencing , and access to the ATS site . <br /> Consultant will prepare for and attend the two Technical Review Committee meetings and <br /> one Board of County Commissioners meeting . <br /> Consultant will perform a hydraulic analysis of the Lateral E- 7 canal to determine if it has <br /> sufficient capacity to handle treated effluent from the ATS site . It is assumed that the <br /> Lateral J canal has sufficient capacity and will not be included in the analysis . It is <br /> anticipated that the following tasks will be performed as part of the hydraulic analysis : <br /> • Determine the service area for the Lateral E- 7 canal based on information from <br /> IRFWCD and available aerials , St . John ' s River Water Management District permit <br /> information , and coordination with the Indian River Farms Water Control District . <br /> This information will be presented on an aerial exhibit. <br /> • Calculate the design capacity of the Lateral E- 7 canal based on the Indian River <br /> Farms Water Control District discharge limit of 2 "/acre during the 25 - year, 24 - hour <br /> storm event . This limit will be applied to the total service area of the E- 7 canal . <br /> K : AWPB_Civil\044572021 - ATS Stornmater PipeAScope\ATS Pipeline Project - Work Order 4 REV Ldoc <br /> Page 5 of9 <br />