My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-228
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:08:05 PM
Creation date
10/1/2015 4:51:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/18/2012
Control Number
2012-228
Agenda Item Number
12.J.1
Entity Name
Kimley-Horn and Associates
Subject
Amendment No.1 to Work Order No. 4
Algal Turf Scrubber System
Area
5th Street SW South RO Plant Concentrate Disposal
Supplemental fields
SmeadsoftID
11641
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 4 — CONSTRUCTION PHASE SERVICES <br /> Additional Construction Phase Services are not included with this Amendment. <br /> Task 5 — ATS SITE PLANNING <br /> Additional ATS Site Planning Services are not included with this Amendment. <br /> ADDITIONAL SERVICES <br /> The following services are not included in the Scope of Services for this project, but may <br /> be required depending on circumstances that may arise during the execution of this project. <br /> Other items that may be considered additional services are mentioned herein. Additional <br /> services include, but may not be limited to the following. <br /> • Construction phase services including preparing the certification documents for the <br /> FDEP and USACE permits <br /> • Additional meetings beyond what is described in the Scope of Services <br /> • Traffic studies <br /> • Building department coordination <br /> • Additional permitting beyond what is described in the Scope of Services, including <br /> preparation of the IRFWCD permit for the proposed connection to the Sub- lateral <br /> J= I canal for discharge and proposed ATS pump station <br /> • Additional wetland mitigation beyond what is described in the Scope of Services <br /> INFORMATION AND SERVICES PROVIDED BY OWNER <br /> The Owner shall provide the following information related to the design of this <br /> construction project : <br /> • Stormwater pump station design, including site and mechanical plans by IRC <br /> public works <br /> • Boundary survey, base survey including wetland delineation, tree survey, <br /> topographical information, and drainage plans and details for the new ATS site by <br /> IRCU <br /> • Geotechnical studies performed for the ATS site <br /> • Drainage calculations that have been prepared for the ATS site and stormwater <br /> pump station <br /> • Copies of easements and plats for the ATS site and stormwater pump station <br /> K:\WPB_Civil\044572021 - ATS Stormwater Pipe\Scope\ATS Additional Permitting\ATS Pipeline Project = W049 <br /> Amend 1 ,Fina1, rev . doc Page 5 of 7 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.