My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-052
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 1:29:45 PM
Creation date
10/1/2015 4:14:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/20/2012
Control Number
2012-052
Agenda Item Number
12.J.1
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No. 2 Algal Turf Scrubber Stormwater collection
Brine conveyance system
Area
South RO Plant
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
included in this scope . <br /> Scrub Jay <br /> The Consultant will conduct a scrub jay survey to assess the potential for scrub jays to <br /> occur in the project area . It is anticipated that there will be up to 3 -4 transects along this <br /> corridor . The Consultant will review current databases and the results of previous <br /> fieldwork to identify known or historic locations of scrub jays in the project area . <br /> Pedestrian transects and call stations will be mapped on field aerials prior to the survey . <br /> Two biologists will conduct the survey in accordance with protocols established by the <br /> USFWS . The survey will be conducted for 5 consecutive days unless weather conditions <br /> prohibit survey . If the weather prohibits survey on a given day then the survey will be <br /> done as soon as possible so that there is no more than a 2 - 3 day gap between survey days . <br /> The survey will be conducted starting 1 hour after sunrise ( approximately 7 : 00 am) and <br /> will end by no later than 12 : 00 pm . Scrub jay vocalizations will be played at each call <br /> station for one minute in each cardinal direction. <br /> A brief memo will be prepared summarizing the results of the scrub jay surveys . The <br /> memo will include a description of the habitat , survey methodologies and a discussion of <br /> the survey results . A habitat map showing the location of transects and call stations and <br /> locations of scrub jays noted (if applicable) will be included in the report . <br /> Permitting for impacts to occupied scrub habitat is not included in this scope but can be <br /> provided as an additional service , if required . <br /> Task 4 — CONSTRUCTION PHASE SERVICES <br /> The forcemain construction of this project consists of approximately 13 , 000 - LF of pipeline <br /> construction , including but not limited to tie - ins, horizontal directional drills (HDD ) , valve <br /> I <br /> nstallation, pressure testing , and site restoration . <br /> The Consultant will provide construction phase services for this project , consisting of bid <br /> phase assistance and preparation of contract documents , shop drawing review, meeting <br /> attendance, construction field observation , and preparation of record drawings based on <br /> contractor red lines ( in electronic format in AutoCADD 2010 version in real world <br /> coordinates on CD) . <br /> It is anticipated that the duration of the construction phase ( notice to proceed to final <br /> completion) will be four ( 4 ) months and that on - site construction observations will be <br /> conducted commensurate with the level of construction activity for each project . <br /> The Consultant will incorporate the Owner ' s contract documents into the plans and <br /> specifications developed in Task — 2 . 2 to create the project manual . This will serve as the <br /> Contract between the Owner and the selected contractor for each of the construction <br /> contract . Any revisions to the Owner ' s contract documents can be provided by the <br /> Consultant , as Additional Services . <br /> K :\WPB_Civil\044572020 . IRCU Membrane&WQ Eval\SRO Brine DisposaRATS Pipeline Project - Work Order 2 <br /> REV2 . doc Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.