My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-052
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 1:29:45 PM
Creation date
10/1/2015 4:14:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/20/2012
Control Number
2012-052
Agenda Item Number
12.J.1
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Work Order No. 2 Algal Turf Scrubber Stormwater collection
Brine conveyance system
Area
South RO Plant
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
During the bidding phase , the Consultant will respond to contractor questions and prepare <br /> a reasonable number of addendums, if required, which will be distributed to all the contract <br /> document holders . The Consultant will attend one ( 1 ) pre-bid meeting at the project site or <br /> Client ' s office . IRCU purchasing department will monitor the bid process and sell project <br /> manuals , consisting of drawings , specifications , and all addendums . <br /> Shop drawing submittals will be reviewed for conformance with the intent of the contract <br /> documents . Shop drawings will be submitted directly to the Consultant . The Consultant <br /> will review the submittals and return copies to the contractor and Indian River County <br /> Utilities . <br /> The Consultant will coordinate and attend one ( 1 ) project status meetings per month for <br /> coordination and status updates of the project with the Contractor and Owner. The <br /> Consultant will also review pay requests and provide recommendations for payment to <br /> Indian River County Utilities for the progress of the work . The Consultant may <br /> recommend Change Orders to Indian River County, and will review and make <br /> recommendations related to Change Orders submitted or proposed by the Contractor . <br /> Construction observation will be provided by a field inspector. Total observation time is <br /> anticipated to be approximately 210 - hours . This is based on 16 -hours per week of field <br /> observations for four months of construction activity . The Consultant ' s visits will be for <br /> the purpose of endeavoring to provide the Client a greater degree of confidence that the <br /> completed work of its contractors will generally conform to the construction documents <br /> prepared by the Consultant . The Consultant neither guarantees the performance of <br /> contractors , nor assumes responsibility for any contractor ' s failure to perform its work in <br /> accordance with the contract documents . Work that the Consultant believes does not <br /> comply with the contract documents will be brought to the attention of Indian River <br /> County Utilities and the contractor. The Consultant shall have no responsibility for any <br /> contractor's means , methods , techniques , equipment choice and usage , sequence , schedule , <br /> safety programs , or safety practices , nor shall the Consultant have any authority or <br /> responsibility to stop or direct the work of any contractor. <br /> A punch- list will be prepared for the items that need to be completed for final closeout of <br /> the project . The Consultant will perform two site visits with the contractor to review the <br /> status of the completion of these punch- list items . <br /> The Consultant will prepare record drawings of the pipeline project using information <br /> provided by the contractor. An electronic copy in AutoCAD format on a CD - ROM , and <br /> two sets of prints will be delivered to Indian River County Utilities upon completion of this <br /> project . <br /> ADDITIONAL SERVICES <br /> The following services are not included in the Scope of Services for this project , but may <br /> be required depending on circumstances that may arise during the execution of this project . <br /> Other items that may be considered additional services are mentioned herein . Additional <br /> services include , but may not be limited to the following : <br /> K :\WPB_Civil\044572020 - IRCU Membrane&WQ Eval\SRO Brine Disposal\ATS Pipeline Project - Work Order 2 <br /> REV2 . doc Page 6 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.