My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-052
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 1:29:45 PM
Creation date
10/1/2015 4:14:23 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Attendance at more than those meetings described in the Scope of Services . <br /> • Design revisions other than those comment responses described in the Scope of <br /> Services . <br /> • Revisions to the Owner ' s contract documents . <br /> • Design, hydraulic analysis , permitting , or any other services for the stormwater <br /> pump station at 27 `x' Avenue SW and the South Relief Canal . <br /> • Permitting services beyond what is described in the Scope of Services . <br /> • Environmental services beyond what is described in the Scope of Services . <br /> INFORMATION PROVIDED BY OWNER : <br /> The Owner shall provide the follow information related to the design of this construction <br /> project : <br /> • Record drawings of water and sewer utilities along the determined route <br /> • Access to the site <br /> • Information including design drawings for the proposed tie - in location at the ATS <br /> site . <br /> • Information including design drawings for the proposed tie- in location at the <br /> proposed stormwater pump station at 27 `x' Avenue SW and the South Relief Canal . <br /> K :\WPB_Civil\044572020 - IRCU Membrane&WQ Eval\SRO Brine Disposal\ATS Pipeline Project - Work Order 2 <br /> REV2 . doc Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.