Laserfiche WebLink
Mr. Himanshu Mehta <br />15 December 2009 <br />Page 4 <br />Project management activities will include budget and schedule tracking, invoice review, and <br />project communications, including the preparation of a monthly progress report. The project <br />report will include a description of the activities completed during the month and planned <br />activities for the following month. In addition, the progress report will identify any technical or <br />administrative issues that require SWDD's attention and the current status of the budget and <br />schedule. <br />Phase 2 — Class I Landfill Renewal Permit Application <br />Geosyntec will prepare the FDEP solid waste renewal permit application for the Class 1 landfill <br />at IRCL site. Geosyntec will complete FDEP Form No. 62-701.900(1) titled "Application for a <br />Permit to Construct, Operate, Modify or Close a Solid Waste Management Facility" and address <br />the additional information items required by the form. The following activities will be <br />performed to prepare the renewal permit application for the Class 1 landfill: <br />• prepare an engineering report addressing the requirements of Rule 62-701.320, FAC. <br />The report will also demonstrate how the SWDD plan to comply with any new or revised <br />laws or rules relating to construction, operation or closure of the Class 1 landfill; <br />• revise and update the operation plan and closure plan as necessary for the Class I <br />landfill; <br />• prepare a contingency plan to cover operations interruptions and emergencies; <br />• update the groundwater monitoring plan, as needed, based on the past five years of water <br />Ievel and analytical data; <br />• prepare engineering permit drawings, including: <br />• a title sheet that depicts the site vicinity, <br />• a current site topographic survey that also depicts facility location and relevant <br />features for the landfill, <br />• an existing conditions plan to depict the most recent topographic survey grades <br />and boundaries along with site storm water features and other pertinent features <br />(e.g., access roads, scale house, monitoring wells, etc.), <br />• a waste -fill sequence plan, <br />• a final closure/grading plan, and <br />• miscellaneous details; <br />• address the prohibitions of the facility in accordance with Rule 62-701.300, FAC; <br />JL90232 IRC LF Permittine.dnc <br />engineers I scientists I innovators <br />