My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-010
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 3:10:39 PM
Creation date
10/1/2015 1:56:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/05/2010
Control Number
2010-010
Agenda Item Number
15.B.1
Entity Name
Landfill Operations Permit Renewal
Subject
Geosyntec, Inc.
Work Order No.25
Supplemental fields
SmeadsoftID
9527
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta <br /> 15 December 2009 <br /> Page 4 <br /> Project management activities will include budget and schedule tracking, invoice review , and <br /> project communications , including the preparation of a monthly progress report . The project <br /> report will include a description of the activities completed during the month and planned <br /> activities for the following month . In addition , the progress report will identify any technical or <br /> administrative issues that require SWDD ' s attention and the current status of the budget and <br /> schedule . <br /> Phase 2 — Class I Landfill Renewal Permit Application <br /> Geosyntec will prepare the FDEP solid waste renewal permit application for the Class 1 landfill <br /> at IRCL site . Geosyntec will complete FDEP Form No . 62-701 . 900 ( 1 ) titled "Application for a <br /> Permit to Construct , Operate , Modify or Close a Solid Waste Management Facility " and address <br /> the additional information items required by the form . The following activities will be <br /> performed to prepare the renewal permit application for the Class 1 landfill : <br /> • prepare an engineering report addressing the requirements of Rule 62- 701 . 320 , FAC . <br /> The report will also demonstrate how the SWDD plan to comply with any new or revised <br /> laws or rules relating to construction , operation or closure of the Class 1 landfill ; <br /> • revise and update the operation plan and closure plan as necessary for the Class I <br /> landfill ; <br /> • prepare a contingency plan to cover operations interruptions and emergencies ; <br /> • update the groundwater monitoring plan , as needed , based on the past five years of water <br /> Ievel and analytical data ; <br /> • prepare engineering permit drawings , including : <br /> • a title sheet that depicts the site vicinity, <br /> • a current site topographic survey that also depicts facility location and relevant <br /> features for the landfill, <br /> • an existing conditions plan to depict the most recent topographic survey grades <br /> and boundaries along with site storm water features and other pertinent features <br /> (e . g . , access roads , scale house , monitoring wells, etc . ) , <br /> • a waste -fill sequence plan , <br /> • a final closure/grading plan , and <br /> • miscellaneous details ; <br /> • address the prohibitions of the facility in accordance with Rule 62- 701 . 300 , FAC ; <br /> JL90232 IRC LF Permittine. doc <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.