Laserfiche WebLink
Mr. Himanshu Mehta <br /> 15 December 2009 <br /> Page 4 <br /> Project management activities will include budget and schedule tracking, invoice review , and <br /> project communications , including the preparation of a monthly progress report . The project <br /> report will include a description of the activities completed during the month and planned <br /> activities for the following month . In addition , the progress report will identify any technical or <br /> administrative issues that require SWDD ' s attention and the current status of the budget and <br /> schedule . <br /> Phase 2 — Class I Landfill Renewal Permit Application <br /> Geosyntec will prepare the FDEP solid waste renewal permit application for the Class 1 landfill <br /> at IRCL site . Geosyntec will complete FDEP Form No . 62-701 . 900 ( 1 ) titled "Application for a <br /> Permit to Construct , Operate , Modify or Close a Solid Waste Management Facility " and address <br /> the additional information items required by the form . The following activities will be <br /> performed to prepare the renewal permit application for the Class 1 landfill : <br /> • prepare an engineering report addressing the requirements of Rule 62- 701 . 320 , FAC . <br /> The report will also demonstrate how the SWDD plan to comply with any new or revised <br /> laws or rules relating to construction , operation or closure of the Class 1 landfill ; <br /> • revise and update the operation plan and closure plan as necessary for the Class I <br /> landfill ; <br /> • prepare a contingency plan to cover operations interruptions and emergencies ; <br /> • update the groundwater monitoring plan , as needed , based on the past five years of water <br /> Ievel and analytical data ; <br /> • prepare engineering permit drawings , including : <br /> • a title sheet that depicts the site vicinity, <br /> • a current site topographic survey that also depicts facility location and relevant <br /> features for the landfill, <br /> • an existing conditions plan to depict the most recent topographic survey grades <br /> and boundaries along with site storm water features and other pertinent features <br /> (e . g . , access roads , scale house , monitoring wells, etc . ) , <br /> • a waste -fill sequence plan , <br /> • a final closure/grading plan , and <br /> • miscellaneous details ; <br /> • address the prohibitions of the facility in accordance with Rule 62- 701 . 300 , FAC ; <br /> JL90232 IRC LF Permittine. doc <br /> engineers I scientists I innovators <br />