Laserfiche WebLink
SECTION 00530 - EJCDC STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE <br /> West Wabasso Sewer and Drainage Improvement Project, Phase 1 <br /> THIS AGREEMENT ("Agreement" or "Contract") , dated the 23d day of October in the year 2012 by <br /> and between Indian River County, a political subdivision of the State of Florida (hereinafter called <br /> OWNER) and Mancil's Tractor Service . Inc. (hereinafter called CONTRACTOR) . <br /> OWNER and CONTRACTOR , in consideration of the mutual covenants hereinafter set forth , agree <br /> as follows : <br /> ARTICLE 1 WORK <br /> CONTRACTOR as an independent contractor and not as an employee shall furnish <br /> and complete all of the necessary labor, material , and equipment to perform the work <br /> as specified or indicated in the Contract Documents and per FDEP , FDOT, County <br /> Utilities Department and County Engineering Department standards . The work is <br /> generally described as follows : <br /> IRCDUS proposes to construct a new 8" Gravity Sewer Collection System within <br /> The Whitfield Subdivision of West Wabasso . The facilities shall provide sewage <br /> collection infrastructure to serve about seventy 70) home sites on 64th Avenue , 86' <br /> Street, 86th Lane , 65th Drive , 65th Court and 64 Drive. The gravity sewer main will <br /> consist of about 3 , 860 feet of 8" PVC gravity sewer, 15 manholes , service laterals , <br /> 1800 of 4" force main and a new Indian River County Department of Utility Services <br /> standard sanitary sewer lift station . The County will direct purchase and furnish the <br /> ABS pumps and electrical package for the lift station which includes two pumps , <br /> lifting cables , guide rails , guide rail assemblies , float hangar bracket , anchor bolts , <br /> lifting bales , upper guide brackets , SS nipples and elbows , float switches , hatch <br /> covers for both the wet well and valve vault, duplex control panel and spare parts <br /> set . The Contractor will install the furnished pumps and all appurtenances required <br /> to make the lift station functional . The County will also direct purchase the Dataflow <br /> telemetry system and the Contractor will install telemetry at the lift station and <br /> schedule Dataflow to program telemetry and all necessary start-up features to <br /> make remote monitoring and operation of lift station functional . Upon successful <br /> operation of lift- station , Contractor shall schedule a start- up with ABS to certify lift <br /> station has been installed in accordance with manufacturer's requirements to affect <br /> warranty . No existing culverts are proposed to be replaced . Any existing culverts <br /> damaged shall be restored to pre-construction condition . <br /> The drainage improvements will consist of minor excavation to remove sediment <br /> that has deposited in the existing swale along the south side of CR 510 between <br /> 64th Avenue and 63`d Court . The deposits have covered and filled in drainage <br /> culverts both under driveways and across CR 510 . Any pipe replaced under CR 510 <br /> shall be RCP and ROW restoration shall include sodding . <br /> The construction of the utility improvements described above shall also consist of, <br /> but not limited to : resetting of signs, mailboxes , and other existing facilities <br /> disturbed during construction ; utilities exploration ; coordination with any permitting <br /> 00530-1 <br />