My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-195B
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-195B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2016 1:24:34 PM
Creation date
10/1/2015 4:47:40 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/23/2012
Control Number
2012-195B
Agenda Item Number
8.H.2
Entity Name
Mancil's Tractor Service Agreement
Subject
West Wabasso Sewer and Drainage Improvement Project Phase 1
Area
Whitfield Subdivision of West Wabasso
Supplemental fields
SmeadsoftID
11616
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
agencies ; trenching ; clearing and tree removal , dewatering ; installation of pipe , <br /> structures and all appurtenances ; soil backfill compaction ; testing ; (including T.V. <br /> testing , exfiltration testing , backfill and subgrade testing) ; road , landscape and <br /> driveway restoration ; regrading and grassing (sod) ; and traffic control . All right —of- <br /> way shall be restored to like or better condition including sidewalks and drainage . <br /> No excavation shall be left open when work is not actively being performed . <br /> Construction fencing used in the work area shall not block sight distance near <br /> intersections or driveways . All construction equipment and materials shall be stored <br /> a minimum of 15 feet from the edge of pavement and shall be protected by Type II <br /> barricades with flashing yellow lights . <br /> The Contractor shall submit a Traffic Control Plan to the County Traffic Engineering <br /> Division a minimum of 72 hours prior to construction and notify County Traffic <br /> Engineering a minimum of 24 hours before any lane closures . A temporary access <br /> plan shall be provided indicating how local traffic will be maintained while the <br /> existing road is removed and reconstructed . Stand mounted Advance Construction <br /> signing shall be installed in accordance with FDOT Index 602 . One lane closures <br /> shall be in accordance with FDOT Index 603 . When any work encroaches the area <br /> between the centerline and two (2) feet outside the edge of pavement , traffic shall <br /> be restricted to a single lane . <br /> The construction will provide existing utility customers that currently only are <br /> provided with water service , the ability to connect to the IRC regional wastewater <br /> collection and treatment system ; and the connection of existing customers to the <br /> system will provide opportunities for existing residences to abandon existing septic <br /> systems , which shall benefit the environment and water quality enjoyed by all Indian <br /> River County residents . <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Gordon E . Sparks , P . E . , hereinafter called ENGINEER, and who <br /> is to act as OWNER'S representative, assume all duties and responsibilities and have the rights and <br /> authority assigned to ENGINEER in the Contract Documents in connection with completion of the <br /> work in accordance with the Contract Documents . <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a) Within 10 calendar days from effective date of Notice to Proceed , Contractor shall <br /> complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized <br /> in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior to <br /> construction . <br /> 4 . Locate all existing utilities in the area of work. <br /> 5 . Submit and secure approval of shop drawings . <br /> 6 . Mobilize all labor, equipment , and materials . <br /> 7 . Deliver and store all equipment and materials to the job site . <br /> 8 . Notify all utilities and other affected parties prior to initiating construction . <br /> 00530-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.