My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-142
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 11:24:48 AM
Creation date
10/1/2015 2:18:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/01/2010
Control Number
2010-142
Agenda Item Number
12.J.2.
Entity Name
Masteller & Moler
Subject
North County Reuse Storage Tank
Amendment Number 2 to Work Order Number 12
Supplemental fields
SmeadsoftID
9704
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT #2 TO EXHIBIT # 1 <br /> 5/ 10/2010 <br /> Page 2 <br /> 2 . NEMA 3 Control Panel — We shall modify the Construction Plans and specifications to <br /> require NEMA 3 control panels in the pump station building to provide additional water <br /> intrusion protection over the NEMA 1 panels originally specified . <br /> 11 . LAND SURVEY SERVICES <br /> In order to support the design of the fiber-optic conduit described in Task I (A) , above , Task II of <br /> the original work order shall be revised to include a limited topographic survey of the Parks and <br /> Recreation site . The survey shall illustrate the existing building and other features along the <br /> proposed route of the conduit . <br /> The survey data collected as part of this task shall be incorporated into the survey performed as <br /> part of the original scope of services . <br /> III . SITE PLAN PERMITTING SERVICES ( NORTH PLANT SITE ) <br /> ( No additional services proposed . ) <br /> IV. CONSTRUCTION SERVICES ( NORTH PLANT SITE ) <br /> The scope of services described in Task IV of the original work order will be expanded by <br /> construction of the additional features described in Task I (A) , above . This task is therefore <br /> revised to include the additional construction services required . <br /> Y: \mm\Projects\2007\0770\0770_LAWDMIN\ContractsWMENDMENT #2\0770LA_Exhibit 1 _Amen#2_Rev #2 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.