Laserfiche WebLink
Our File # 1154 <br /> November 30 , 2011 <br /> NON - EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> " EXHIBIT 1 " <br /> ( Scope of Work ) <br /> • Project Description <br /> Work Order # 1 provides for professional engineering services to include land surveying and <br /> engineering services to support the construction of a stormwater reuse supply and <br /> treatment system to expand Indian River County' s reuse water system supply capacity . <br /> The project will generally involve development of a stormwater reuse pumping station on <br /> property at the northeast corner of 66th Avenue and 57th Street . Said land is currently <br /> owned by the Indian River School District . At this location a Stormwater reuse treatment <br /> system and pumping station can be developed to obtain Stormwater from the adjacent <br /> Indian River Farms Water Control District ( IRFWCD ) Lateral A Canal . At this location the <br /> County' s existing reuse water system coming from the West Regional wastewater <br /> treatment plant changes in size from 12 " to 16" in diameter . The proposed Stormwater <br /> reuse pumping and treatment facilities will also be equipped with a high service booster <br /> pump that will allow for maintaining the reuse flow rates from the West Plant to the new 3 . 0 <br /> MG reuse storage tank on 77th Street ( Hobart Road ) . It is anticipated the construction cost <br /> for the project will be $ 11815 , 000 . 00 . <br /> A brief description of the scope of services and deliverables for Work Order # 1 is provided <br /> below : <br /> • Scope of Services <br /> Task A — Conceptual Design Coordination <br /> Masteller & Moler, Inc . will develop a Conceptual Design for the Stormwater Reuse <br /> Pumping & Treatment Facilities to include selection of surface water pumps , bar screens , <br /> filter equipment , booster pumps , and liquid chlorination equipment . We shall advance the <br /> conceptual design to a point where the special arrangement of these facilities is sufficiently <br /> accurate to identify the size of the parcel of land needed to support the pumping & <br /> treatment facilities as well as supporting access driveway , stormwater management <br /> features , landscape buffers and fencing . <br /> Once the Conceptual Design has been accepted by County Utilities , Masteller & Moler, Inc . <br /> will provide assistance to the County to obtain Conceptual Approval of the proposed project <br /> from both the Indian River School District ( IRSD ) and Indian River Farms Water Control <br /> District ( IRFWCD ) . This may involve meeting with IRSD and IRFWCD staff and attendance <br /> at board meetings . <br />