My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-256
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 9:25:52 AM
Creation date
10/1/2015 3:07:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/13/2011
Control Number
2011-256
Agenda Item Number
12.J.2
Entity Name
Masteller and Moler
Indian River School District
Subject
Work Order No.1 Storm Grove Stormwater Reclamation
Reuse water Supply
Area
Northeast corner 66th Avenue and 57th. Street
Supplemental fields
SmeadsoftID
10411
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit # 1 (Scope of Work) Work Order # 1 <br /> 11/30/2011 <br /> Page 2 <br /> The Engineer shall not proceed to perform further tasks beyond Task A in this Work <br /> Authorization until the County has accepted the Conceptual Design and provides Engineer <br /> with a written Notice to Proceed to the next task . <br /> Task B — Limited Site Topographic Survey <br /> Masteller & Moler , Inc . through its land surveying affiliate will perform a limited site <br /> topographic survey to support design of the proposed stormwater reuse improvements for <br /> this project . The survey shall include sufficient information on the site as well as within the <br /> adjacent Indian River Farms Water Control District' s Lateral A and 57th Street right- of-way <br /> including its bridge at 66th Avenue . <br /> Task C — Engineering Design Services <br /> Masteller & Moler , Inc . shall perform engineering design services to prepare Construction <br /> Plans and Technical Specifications to allow for the construction of the following stormwater <br /> reuse improvements for this project : <br /> 1 . Stormwater reuse connection to the IRFWCD Lateral A Canal ; <br /> 2 . Stormwater pumping station wetwell with debris screen and concrete slab ; <br /> 3 . Stormwater pumping station with duplex variable speed pumps rated at maximum of <br /> 1 , 000 gallon per minute capacity at sufficient pressure to direct flow through the <br /> proposed treatment system ; <br /> 4 . Stormwater reuse filtration system with automatic backwash discharge system , turbidity <br /> monitoring , and flow metering ; <br /> 5 . Liquid ( Sodium hypochlorite ) chlorination system ; <br /> 6 . Duplex High Service Booster Pumping Equipment with variable speed system to pump <br /> treated Stormwater to the new 3 . 0 MG reuse storage tank on Hobart Road ; <br /> 7 . Duplex High Service Booster Pumping Equipment with variable speed system for <br /> existing IRC reuse main to allow for maintenance of flow rate of reuse water flows from <br /> the West Regional Plant to the 3 . 0 MG reuse storage tank on Hobart Road ; <br /> 8 . Backwash force main extension to the existing IRC sewage lift station approximately <br /> 1000 ' east of the site ; <br /> 9 . Piping connections to the IRC existing 16" reuse main along 57th Street ; <br /> 10 . Site Entry driveway with access to 57th Street and site fencing / lighting / buffer <br /> landscaping . <br /> The proposed high service booster pumps , valves , piping , variable speed controls , turbidity <br /> monitoring , flowmeter , and chlorination system will be designed to be contained within an <br /> attractive , air conditioned package structure to be mounted on a concrete slab . <br /> The above described improvements will be described in a Preliminary Engineering Report <br /> ( PER ) which will document the project' s design criteria . <br /> In order to support the above described engineering design , we shall also retain <br /> geotechnical / structural , and electrical engineering sub-consultants for design of structural <br /> engineering and power supply elements , respectfully . <br />
The URL can be used to link to this page
Your browser does not support the video tag.