Laserfiche WebLink
Exhibit # 1 (Scope of Work) Work Order # 1 <br /> 11/30/2011 <br /> Page 2 <br /> The Engineer shall not proceed to perform further tasks beyond Task A in this Work <br /> Authorization until the County has accepted the Conceptual Design and provides Engineer <br /> with a written Notice to Proceed to the next task . <br /> Task B — Limited Site Topographic Survey <br /> Masteller & Moler , Inc . through its land surveying affiliate will perform a limited site <br /> topographic survey to support design of the proposed stormwater reuse improvements for <br /> this project . The survey shall include sufficient information on the site as well as within the <br /> adjacent Indian River Farms Water Control District' s Lateral A and 57th Street right- of-way <br /> including its bridge at 66th Avenue . <br /> Task C — Engineering Design Services <br /> Masteller & Moler , Inc . shall perform engineering design services to prepare Construction <br /> Plans and Technical Specifications to allow for the construction of the following stormwater <br /> reuse improvements for this project : <br /> 1 . Stormwater reuse connection to the IRFWCD Lateral A Canal ; <br /> 2 . Stormwater pumping station wetwell with debris screen and concrete slab ; <br /> 3 . Stormwater pumping station with duplex variable speed pumps rated at maximum of <br /> 1 , 000 gallon per minute capacity at sufficient pressure to direct flow through the <br /> proposed treatment system ; <br /> 4 . Stormwater reuse filtration system with automatic backwash discharge system , turbidity <br /> monitoring , and flow metering ; <br /> 5 . Liquid ( Sodium hypochlorite ) chlorination system ; <br /> 6 . Duplex High Service Booster Pumping Equipment with variable speed system to pump <br /> treated Stormwater to the new 3 . 0 MG reuse storage tank on Hobart Road ; <br /> 7 . Duplex High Service Booster Pumping Equipment with variable speed system for <br /> existing IRC reuse main to allow for maintenance of flow rate of reuse water flows from <br /> the West Regional Plant to the 3 . 0 MG reuse storage tank on Hobart Road ; <br /> 8 . Backwash force main extension to the existing IRC sewage lift station approximately <br /> 1000 ' east of the site ; <br /> 9 . Piping connections to the IRC existing 16" reuse main along 57th Street ; <br /> 10 . Site Entry driveway with access to 57th Street and site fencing / lighting / buffer <br /> landscaping . <br /> The proposed high service booster pumps , valves , piping , variable speed controls , turbidity <br /> monitoring , flowmeter , and chlorination system will be designed to be contained within an <br /> attractive , air conditioned package structure to be mounted on a concrete slab . <br /> The above described improvements will be described in a Preliminary Engineering Report <br /> ( PER ) which will document the project' s design criteria . <br /> In order to support the above described engineering design , we shall also retain <br /> geotechnical / structural , and electrical engineering sub-consultants for design of structural <br /> engineering and power supply elements , respectfully . <br />