My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-256
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 9:25:52 AM
Creation date
10/1/2015 3:07:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/13/2011
Control Number
2011-256
Agenda Item Number
12.J.2
Entity Name
Masteller and Moler
Indian River School District
Subject
Work Order No.1 Storm Grove Stormwater Reclamation
Reuse water Supply
Area
Northeast corner 66th Avenue and 57th. Street
Supplemental fields
SmeadsoftID
10411
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit # 1 (Scope of Work) Work Order # 1 <br /> 11/30/2011 <br /> Page 3 <br /> The Engineer shall not proceed to perform further tasks beyond Task C in this Work <br /> Authorization until the County has accepted the Engineering Design and provides Engineer <br /> with a written Notice to Proceed to the next task . <br /> Task D — Boundary Survey / Legal Description <br /> In order that the County may secure the land needed for this project , we shall prepare <br />a <br /> Boundary Survey of the land area needed on the Indian River School District lands for <br /> construction of the stormwater reuse pumping station , treatment facilities , booster station <br /> structure , and related improvements . We will prepare appropriate copies of the Boundary <br /> Survey for the County Attorney' s office in order that the County may secure and record the <br /> parcel acquisition from the Indian River School District for this project . <br /> Task E — Permitting <br /> We shall coordinate making applications to obtain approvals / permits to authorize <br /> construction of the project improvements as follows : <br /> Florida Department of Environmental Protection Construction Permit <br /> St. Johns River Water Management District Consumptive Use Permit <br /> USACOE Culvert Connection Nationwide Permit <br /> Indian River County Minor Site Plan Approval <br /> Indian River County Land Clearing Permit <br /> Indian River County Type A Stormwater Permit <br /> Indian River Farms Water Control District Construction Permit <br /> Indian River County Right-of-Way Permit <br /> Any NPDES permitting required for this project will be required in the contract <br /> specifications to be obtained by the successful bidding contractor . These services are not <br /> included within our fee . <br /> This proposal does not include any environmental services relating to wetland impacts or <br /> threatened & endangered species other than the above described USACOE NWP . It is <br /> understood that the County' s Environmental Planning Department will provides these <br /> services if required . <br /> The Engineer shall not proceed to perform further tasks beyond Task E in this Work <br /> Authorization until the County provides Engineer with a written Notice to Proceed . <br /> Task F — Bidding & Construction Services <br /> Masteller & Moler , Inc . will work with Indian River County to allow for bidding of the <br /> proposed construction work to be described in the Construction Plans and Technical <br /> Specifications . We shall attend a Pre-bid meeting to describe the project to bidding <br /> contractors . We shall review the bids to be received by the County Purchasing Department <br /> and make a recommendation for award of the contract to the lowest qualified bidder . <br />
The URL can be used to link to this page
Your browser does not support the video tag.