My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-114
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2015 12:10:40 PM
Creation date
10/1/2015 5:20:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/18/2013
Control Number
2013-114
Agenda Item Number
12.J,1
Entity Name
MBV Engineering Inc.
Subject
Work Order No.7 FDEP Permit Renewals
Area
Blue Cypress Central Regional Waste Water Treatment
Supplemental fields
SmeadsoftID
11961
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br /> INDLWRIVER COUNTY UTILITIESaFDEP-PERMIT-RENEWALS . - - - - _ <br /> _-_ ___ ----_-- ------- i3'BLIE CI'RESS WW3`F AND ,CEI�1TRAb <br /> GENERAL <br /> The Indian River County Central Wastewater Treatment Facility (WWTF) Operating Permit <br /> (FLA010431 ) will expire on March 29, 2014 and. the Blue Cypress W WTF .Permit (FLAO10439) <br /> will expire on April 19, 2014, Rule 62-620: 335 of the Florida Administrative Code (F.A.C.) <br /> requires that all wastewater treatment facilities renew the FDEP Operating Permit every five <br /> years . Applications for permit renewal must be submitted to .the appropriate FDEP office six <br /> months prior to the expiration of the FDEP Permit.. Therefore, the renewal application for the <br /> Indian River County Central WWTF is due on or before September 29; 201' 3 and the Blue <br /> Cypress WWTF renewal application is due on or before October 19, 2013 . The following scope <br /> is provided to address these items. <br /> SCOPE OF SERVICES <br /> Task 1 — Site Inspection <br /> CONSULTANT will conduct the required site inspections to inspect the site and meet with the <br /> plant operators. The inspections will include an evaluation of the following:: <br /> 1 . The general condition of the facility i <br /> 2 . Component, system, . and process reliability standards as required by Rule 17- <br /> 600.400( 1 )(b), F.A.C. <br /> 3 . Component; system, andprocess operations <br /> 4. Hydraulic and organic loading <br /> 5 . Safety features <br /> 6. Operator certifications <br /> T Facility maintenance program <br /> 8 . Facility records <br /> 9. Sampling procedures <br /> 10 . Laboratory analysis procedures <br /> Task 2 — Tabulation and Analysis of Plant Operating Data <br /> CONSULTANT will tabulate and analyze, as required by .FDEP, historical plant operating data, <br /> which documents plant operating conditions for the duration of the current operating permit. <br /> Plant operating data will be provided by Indian River County Utilities (IRCU) staff as specified <br /> in the "Required Information to be Provided by County" section found within this Scope of <br /> Services. <br /> Task 3 — Preparation and Submittal of FDEP Permit Renewal Application <br /> CONSULTANT will prepare and provide to FDEP and IRCU, the following applications and <br /> forms necessary to obtain the facility' s required operating permit. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.