"SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following: <br />The time for completion of 100% design drawings, will be approximately six (6) months, and will include <br />submittal for the project permit. All other associated work, including permit coordination and other associated work <br />with the scope of services detailed in this amendment (Number 5) may extend up to twenty-four (24) additional <br />months beyond the timeline established by and between the ENGINEER and the COUNTY, as agreed in previous <br />Amendment Number 4. The adherence to this schedule is directly associated with, and impacted by the COUNTY <br />to secure the project right -of --way, secure all utility agreements, as per FDOT requirements, and possible weather <br />conditions, and/or gaining access to private property, and the FDOT permit process, which is out of the control of <br />the ENGINEER and COUNTY, as it is related to internal departmental reviews of individual FDOT departments. <br />Should these herein current supplemental project conditions be altered, the assumed time frame, as well as the <br />supplemental fee effort, enumerated herein, to complete the 100% plans, will be effected, and will therefore, be <br />addressed in a separate supplemental amendment, and will require approval by the COUNTY. <br />